My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3717 MCDOUGALL AVE CUMMINS NW 2025-01-23
>
Address Records
>
MCDOUGALL AVE
>
3717
>
CUMMINS NW
>
3717 MCDOUGALL AVE CUMMINS NW 2025-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 8:02:58 AM
Creation date
10/31/2024 1:22:18 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3717
Tenant Name
CUMMINS NW
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.PLEASE CHECK WITH AR LOCAL JIISDICTION TO DETERItE REQUIRED SIGNATURES <br /> A. Owner Responsibilities <br /> The owner or the design professional in responsible charge acting as the owner's agent,shall fund special <br /> inspection services.The owner is responsible for seeing that these requirements are met. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Owner/ <br /> Agent: Vummins/tveren By: mark vvatcner <br /> Y Date:Sri 4/zuz4 <br /> B. Registered Design Professional Responsibilities <br /> 1. The registered design professional in responsible charge(engineer,or architect),shall include special inspection <br /> requirements and specifications on the plans. <br /> 2. Provide structural observation where required per IBC Section 1704.6. <br /> 3. Prepare the Statement of Special Inspections in accordance with IBC section 1704.3 and identify Structural Testing for <br /> Seismic Resistance per IBC section 1704.3.2(When required).The statement of special inspections shall identify <br /> items fabricated on the premises of an approved fabricator where special inspections are not required by section <br /> 1704.2.5. <br /> 4. Review the special inspection reports and provide corrective action for work that may not conform to the approved <br /> plans. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Registered Design • <br /> Professional in <br /> Resp.Charge: By: Date: <br /> Structural <br /> Engineer <br /> of Record: By: basil Katuia LbbU Date:0/14/4UZ4 <br /> C. Contractor's Responsibilities <br /> 1. Notify the agency: <br /> The contractor is responsible for notifying the inspection agency in sufficient time for scheduling personnel to <br /> perform required inspections. <br /> 2. Written statement of responsibility: <br /> Contractor shall complete this form to satisfy IBC 1704.4 Contractor responsibility for construction of designated <br /> main-wind or seismic force resisting system.Additional information shall be provided where requested by the <br /> jurisdiction. <br /> 3. Provide access to Jurisdiction approved plans: <br /> The approved plans shall be readily accessible at the job site. <br /> 4. Provide access to work: <br /> The contractor shall provide reasonable access to all work requiring special inspection. <br /> 5. Retaining special inspection reports at the job site: <br /> The contractor is also responsible for retaining at the job site all special inspection records submitted by the special <br /> inspector and providing these records for review by the Building Departments inspector upon request. <br /> 6. Notify Jurisdiction of special inspections prior to scheduled inspection time. <br /> 7. Provide a copy of special inspector's credentials when requested by thejurisdiction. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Contractor:mr raacks t_w By: man rrevost mr racks Lt_(r Date:5/14/LUL4 <br /> D. Duties of the Special Inspector <br /> 1. Inspect and/or test the work: <br /> The inspector shall inspect and/or test the work for compliance with the Jurisdiction approved plans, <br /> specifications, and applicable provisions of the IBC.The architect/engineer's reviewed shop drawings,and/or <br /> placement drawings, may be used only as an aid to inspections. <br /> • Continuous Special Inspection—The full-time observation of work requiring special inspection by an approved <br /> special inspector who is present in the area where the work is being performed. <br /> • Periodic Special Inspection—The part-time or intermittent observation of work requiring special inspection by an <br /> approved special inspector who is present in the area where the work is being performed and at the completion of <br /> the work report non-conforming items: <br /> GENERAL INFORMATION: Page 4 of. <br /> • Obtain a building permit before starting construction. Form created by. <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that <br /> may be required per 2018 IBC.Additional information can be found at your local building department. '{eCityGov.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.