• • • • <br /> The inspector shall bring non-conforming items to the immediate attention of the contractor and note all such items in <br /> the daily report. If any item is not resolved in a timely manner and is about to be incorporated in the work,the special <br /> inspector shall immediately notify the Building Department,the engineer or architect,his/her office. <br /> 2. Furnish daily reports: <br /> The special inspector shall complete a daily report for each day's inspections. The daily reports shall remain at the <br /> job site with the contractor for the Building Department's inspector.The reports shall include the following: <br /> a. Name of special inspector with WABO certification number and certification type,date,time, temperature <br /> and weather conditions. <br /> b. Description of the inspections, with locations and tests performed. <br /> c. Listing any non-conforming items. <br /> d. Include how items were resolved orunresolved. <br /> e. List any changes or corrections to non-conforming issues authorized by the engineer,architect,or <br /> Jurisdiction's building inspectors. <br /> 3. Furnish weekly reports: <br /> The inspection agency shall furnish weekly reports of the tests and inspections performed directly to the Building <br /> Department,project engineer, architect,and/or others as designated. <br /> 4. Furnish final report: <br /> The inspection agency shall submit a final signed report to the Building Department stating that all items requiring <br /> special inspections and testing were fulfilled, all discrepancies were corrected or resolved, and all work requiring <br /> special inspections is in conformance with the approved design drawings andspecifications. <br /> • Any items unresolved or discrepancies in coverage(i.e.,missed inspections,periodic inspections when <br /> continuous was required,etc.)shall be specifically itemized in this report. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Special Inspection (� ^ I <br /> Agency: watt t esting By: I J t�runaen Date: 2 1 !� C Zq <br /> Material Testing <br /> Agency: By: Date: <br /> Geotechnical Inspection <br /> Agency: By: Date: <br /> Other: By: Date: <br /> Other: By: Date: <br /> E. Submittals to the Building Official <br /> 1. In addition to the submittal of reports of special inspections and tests by the approved special inspection <br /> agency in accordance with IBC Section 1704.2.4, reports and certificates shall be submitted by the <br /> owner or the owner's authorized agent to the building official for items listed in IBC 1704.5. <br /> F. Jurisdiction <br /> 1. The Jurisdiction will review the implementation of Structural Tests and Special Inspection requirements. <br /> 2. Review special inspections: <br /> The Building Department shall review all special inspectors and special inspection requirements found <br /> in IBC Chapter 17 and the WABO-SIRP Standards 1701. <br /> 3. Monitor special inspections: <br /> Work requiring special inspections, and the performance of special inspectors, may be monitored by the <br /> Building Department's inspector.The jurisdiction's approval must be obtained prior to placement of <br /> concrete or other similar activities in addition to that of the special inspector. <br /> 4. Perform inspections as required by the local building code. <br /> 5. Issue Certificate of Occupancy: <br /> The Building Department will only issue a Certificate of Occupancy after all special inspection reports <br /> and the final special inspection report, have been submitted and accepted. <br /> • <br /> Building Official: Date: <br /> GENERAL INFORMATION. c___Page5of5 <br /> • Obtain a building permit before starting construction. Farm created <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that <br /> may be required per 2018 IBC.Additional information can be found at your local building department. e C lty G ov.n et <br />