My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3717 MCDOUGALL AVE CUMMINS NW 2025-01-23
>
Address Records
>
MCDOUGALL AVE
>
3717
>
CUMMINS NW
>
3717 MCDOUGALL AVE CUMMINS NW 2025-01-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 8:02:58 AM
Creation date
10/31/2024 1:22:18 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3717
Tenant Name
CUMMINS NW
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • • <br /> The inspector shall bring non-conforming items to the immediate attention of the contractor and note all such items in <br /> the daily report. If any item is not resolved in a timely manner and is about to be incorporated in the work,the special <br /> inspector shall immediately notify the Building Department,the engineer or architect,his/her office. <br /> 2. Furnish daily reports: <br /> The special inspector shall complete a daily report for each day's inspections. The daily reports shall remain at the <br /> job site with the contractor for the Building Department's inspector.The reports shall include the following: <br /> a. Name of special inspector with WABO certification number and certification type,date,time, temperature <br /> and weather conditions. <br /> b. Description of the inspections, with locations and tests performed. <br /> c. Listing any non-conforming items. <br /> d. Include how items were resolved orunresolved. <br /> e. List any changes or corrections to non-conforming issues authorized by the engineer,architect,or <br /> Jurisdiction's building inspectors. <br /> 3. Furnish weekly reports: <br /> The inspection agency shall furnish weekly reports of the tests and inspections performed directly to the Building <br /> Department,project engineer, architect,and/or others as designated. <br /> 4. Furnish final report: <br /> The inspection agency shall submit a final signed report to the Building Department stating that all items requiring <br /> special inspections and testing were fulfilled, all discrepancies were corrected or resolved, and all work requiring <br /> special inspections is in conformance with the approved design drawings andspecifications. <br /> • Any items unresolved or discrepancies in coverage(i.e.,missed inspections,periodic inspections when <br /> continuous was required,etc.)shall be specifically itemized in this report. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Special Inspection (� ^ I <br /> Agency: watt t esting By: I J t�runaen Date: 2 1 !� C Zq <br /> Material Testing <br /> Agency: By: Date: <br /> Geotechnical Inspection <br /> Agency: By: Date: <br /> Other: By: Date: <br /> Other: By: Date: <br /> E. Submittals to the Building Official <br /> 1. In addition to the submittal of reports of special inspections and tests by the approved special inspection <br /> agency in accordance with IBC Section 1704.2.4, reports and certificates shall be submitted by the <br /> owner or the owner's authorized agent to the building official for items listed in IBC 1704.5. <br /> F. Jurisdiction <br /> 1. The Jurisdiction will review the implementation of Structural Tests and Special Inspection requirements. <br /> 2. Review special inspections: <br /> The Building Department shall review all special inspectors and special inspection requirements found <br /> in IBC Chapter 17 and the WABO-SIRP Standards 1701. <br /> 3. Monitor special inspections: <br /> Work requiring special inspections, and the performance of special inspectors, may be monitored by the <br /> Building Department's inspector.The jurisdiction's approval must be obtained prior to placement of <br /> concrete or other similar activities in addition to that of the special inspector. <br /> 4. Perform inspections as required by the local building code. <br /> 5. Issue Certificate of Occupancy: <br /> The Building Department will only issue a Certificate of Occupancy after all special inspection reports <br /> and the final special inspection report, have been submitted and accepted. <br /> • <br /> Building Official: Date: <br /> GENERAL INFORMATION. c___Page5of5 <br /> • Obtain a building permit before starting construction. Farm created <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that <br /> may be required per 2018 IBC.Additional information can be found at your local building department. e C lty G ov.n et <br />
The URL can be used to link to this page
Your browser does not support the video tag.