My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD TERRA POWER 2025-01-13
>
Address Records
>
SEAWAY BLVD
>
3301
>
TERRA POWER
>
3301 SEAWAY BLVD TERRA POWER 2025-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 8:19:19 AM
Creation date
10/31/2024 2:50:47 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
TERRA POWER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51.5276 <br /> GEOT IFT I Oak Hart <br /> Bellingham I Arlington Oak Harbor <br /> wwW.geotest-inc.com <br /> An RMA Company <br /> Concrete Inspection & Compressive Strength Test Report <br /> PROJECT: TerraPower Industrial Foundation JOB#: 23-3648 <br /> ADDRESS: 3315 Seaway Blvd, Everett,WA REPORT#: CB003 <br /> PERMIT M B2405-012 DATE: 7/26/2024 <br /> CLIENT: Tiger Pearson Construction PAGE#: 1 of 2 <br /> CONTRACTOR: Tiger Pearson Construction INSPECTOR: Dan Weaver <br /> Placement Location: Pit Stem Walls <br /> Sample Location: 8 Cubic Yard Load <br /> Field Data: Eq. No. <br /> Supplier Heidelberg Materials Slump, in.(C143) 6.00 33 <br /> Mix# PREPELEX Air Content, %(C231) N/T <br /> Mix Description 7Sk,16%Fly Ash,GLENIUM 7500,HYCRETE&3/4"Aggregate Unit Weight,pcf(C138) N/T <br /> Truck/Ticket# 369/1476200 Air/Mix Temp.,°F(C1064) 72/75 DW05 <br /> Strength Required 4000 psi at 28 days Initial Cure Temperature, °F NT A-15 <br /> Quantity Placed,cy 8 Cure Method-Initial/Final Container/Water Tank <br /> Time Batched 12:00 PM Water Added on Job,gals 12 <br /> Time Sampled 1:25 PM Water Requested by Contractor <br /> Laboratory Data: <br /> Lab Test Age Test Total Load Avg.D Area Compressive <br /> No. (Days) Date (Ibs) (in) (in2) Strength (psi) Remarks <br /> 72596 3 07-29 39660 4.01 12.63 3140 TYPE 5: <br /> 72597 28 08-23 0 0.00 0.00 0 <br /> 72598 28 08-23 0 0.00 0.00 0 <br /> 72599 28 08-23 0 0.00 0.00 0 <br /> 72600 Hold 00-00 0 0.00 0.00 0 <br /> Reinforcement V Conforming ❑ Non-Conforming ❑ N/A Specimen Size 4"X 8" <br /> Strength Attained at 28 Days: Test Reference ASTM C31/C39/C1231 <br /> Comments: GeoTest was on site today to perform reinforced concrete special inspection. Wall <br /> and slab dowel reinforcement was in place secure and found to conform with the details on <br /> S3.1. Concrete was placed via 32 meter boom pump and internally vibrated. <br /> COPIES:brady@tigerconstruction.us,Todd@tigerconstruction.us Reviewed by <br /> This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. <br /> The above test results relate to the sample(or location)tested. <br /> Arlington Lab,20527 67th Ave NE,Arlington,WA 98223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.