Laserfiche WebLink
• • <br /> KINGWORKS MEMO <br /> STRUCTURAL <br /> ENGINEERS 6/25/2024 <br /> 600 Dupont St,Suite B 360.714.8260 <br /> Bellingham,WA 98225 www.king-works.com <br /> Project: Tiger-TerraPower MCRE Mockup Pit 24043 <br /> To: Brady Jonas — SOUED <br /> 6280 Everson Goshen Road <br /> Everson,WA 98247 <br /> AUG 2 0 2024 <br /> cc: CITY OF EVERETT <br /> Permit Services <br /> Re: MCRE Mock-Up Pit Orientation <br /> We understand that the Owner has requested to rotate the mock-up pit 90 degrees from its orientation as shown in <br /> the permit documents. <br /> Upon reviewing TerraPower LLC's MCRE-MOCK-DWG-001 drawing, Revision 2 dated 6/12/24,we confirm that the <br /> proposed orientation of the mock-up pit is structurally acceptable.The pit is a standalone structure, and the rotation <br /> will not affect its structural performance. <br /> It is important to note that the bottom of the pit is at an elevation of-4'-7"below the existing finished floor elevation. <br /> The proposed location is approximately 6'-10"clear from the existing crane rail foundation,which has a bottom of <br /> footing that is-1'-4"below the existing finished floor elevation. Care should be exercised to not over-excavate within <br /> a 1:1 slope outward from the bottom of the existing foundation to avoid undermining it. <br /> R. <br /> OF <br /> /4 k:, . 1 <br /> ,6 5/2Q,4 <br /> r <br /> �i�`,p,_ S7388 a,& <br /> S L = ` <br /> SIGNAL <br /> THIS ELECTRONIC 5 AI.AND SIGNATURE <br /> APPLIED WITHIN AN ELECTRON. DOCUMCNT.. <br /> A]I L SIGNATURE IS APPLIED AT CN£ <br /> LI LOCATION IN TNN DOCUMENT. EoianE,...) <br /> © 'S <br /> D <br /> J U L 2 2 2024 <br /> From: Bernt Johnson, SE/ Senior Engineer CITY OF EVERETT <br /> Permit Services <br />