My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD TERRA POWER 2025-01-13
>
Address Records
>
SEAWAY BLVD
>
3301
>
TERRA POWER
>
3301 SEAWAY BLVD TERRA POWER 2025-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 8:19:19 AM
Creation date
10/31/2024 2:50:47 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
TERRA POWER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KI N G WO R KS PROJECT MCRE Mock-Up Mat Foundation <br /> r;Al <br /> STRUCTURAL DESCRIPTION Structural Calculations <br /> ENGINEERSENGINEER PROJECT NO. DATE PAGE <br /> 600 Dupont St,Suite B 360.714.8260 BJ 24043 4/30/24 1 <br /> Bellingham,WA 98225 www.king-works.com <br /> 07/08/2024 Note: This calculation <br /> package is unchanged from previously SoO � <br /> submitted and approved permit. F if <br /> -Brendan Bakey/JPC Architects ! l �1 °` <br /> d_... asuE -Th <br /> ep- <br /> , �i' 0/20 4 <br /> ��\ 738 <br /> AUG 2 0 2024 J ass o Aiv_ <br /> CITY OF EVERETT THIS <br /> ELECTRONIC <br /> h=h = ESIGNATURE <br /> ='m s <br /> A DIGZTAL SSGNAT.URE ZS AP LZED hT ONE <br /> Permit Services LOCATION IN THE D,COMENS. <br /> STRUCTURAL CALCULATIONS <br /> FOR <br /> MCRE Mock-Up Pit <br /> 3315 Seaway Boulevard <br /> Everett, WA 98203 <br /> D ECEINE li <br /> Code: 2021 International Building Code JUL 2 2 2024 „/ <br /> Loads: Sds= 1.11g/Sd1 =0.493g/Site Class C <br /> LL=50 psf(typical);250 psf during construction CITY OF EVERETT <br /> DL=Equipment Self Wt-see appendix Permit Services <br /> 3000 PSF Allowable Bearing <br /> Risk Category II Structure <br /> Description: <br /> Structural calculations for the Mat foundation and Equipment anchorage at the above noted <br /> project. All loads and reactions of equipment onto the mat have been provided by TerraPower. <br /> Equipment structural calculations will be submitted via the deferred submittal process where <br /> reactions will be confirmed/verified. All reactions provided by TerraPower have been increased <br /> by 20%to allow for additional conservatism in design. <br /> Page Item <br /> 1 Cover <br /> 2 Design Criteria(Wind,Seismic, Snow, Dead Loads) <br /> 4 Mat Foundation Design <br /> 58 Component Anchorage Calculations <br /> 122 Appendix-Performance Spec/Basis of Design <br /> Page 1 of 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.