My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burton Construction, Inc. 10/30/2024
>
Contracts
>
Job Order Contracting
>
Job Order Contracting
>
Burton Construction, Inc. 10/30/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 2:37:59 PM
Creation date
11/1/2024 2:34:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burton Construction, Inc.
Approval Date
10/30/2024
Council Approval Date
10/23/2024
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Job Order Contracting for General Construction Services
Tracking Number
0004569
Total Compensation
$4,000,000.00
Contract Type
Job Order Contracting
Contract Subtype
Job Order Contracting
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />6.19.3 The Progress Schedule shall outline the proposed operations, the interrelations <br />of the various operations, and the order of performance in sufficient detail that <br />progress of the Work can be evaluated accurately at any time during the <br />performance of the Work. If abbreviations are used in the make-up of the <br />Progress Schedule, a legend is to be provided to define all abbreviations. <br />6.19.4 If milestone completions are required by the Job Order, then those milestones <br />are to be clearly defined on the Progress Schedule. <br />6.19.5 Should it become evident that the Contractor may fail to meet the scheduled <br />dates as shown, the Project Manager may require the Contractor to submit a <br />recovery schedule demonstrating its proposed plan to make up lag in scheduled <br />progress and to ensure completion of the work within the Job Order Completion <br />Time. The Contractor, upon request, will be required at Contractor’s own <br />expense to submit a revised Progress Schedule and to increase Contractor’s work <br />force and working hours (second and third shifts) as required to bring the actual <br />completion dates of the activities into conformance with the Progress Schedule. <br />Further, Contractor will submit a revised Progress Schedule at no cost to the City <br />when, in the opinion of the Project Manager, Contractor’s sequence of Work <br />varies significantly from that shown on the Progress Schedule. The City reserves <br />the right to withhold progress payments until such time as an approved modified <br />Progress Schedule in a form satisfactory to the Project Manager has been <br />provided by the Contractor. <br />6.19.6 Failure of the Contractor to substantially comply with the requirements of this <br />section may be considered grounds for a determination by the City that the <br />Contractor is failing to prosecute the Work with such diligence as will ensure its <br />completion within the time specified, and to take whatever action the City <br />deems necessary and appropriate under the terms of the Contract Documents. <br />6.20 On-Site Documents <br />6.20.1 The Contractor is to maintain at the Project site, in good order for ready <br />reference by the Project Manager, one (1) complete record copy of the Detailed <br />Scope of Work, including changes in the Work, Field Orders, and all working <br />drawings, Progress Schedule, and other approved submittals. <br />The Job Order record drawings are to be marked to truly record all changes made <br />during construction, i.e., the "as-built" conditions. The Project’s record drawings <br />are to be updated on a weekly basis and before elements of the Work are <br />covered or hidden from view. After the completion of the Work or portions of <br />the Work and before requesting final inspection, the record copy of the <br />Drawings will be given to the Project Manager. <br />6.21 Working Drawings, Product Data, Samples, and Other Submittals <br />6.21.1 The Contractor will review and submit all working drawings, product data, <br />samples and other items required to be submitted to the City accompanied by a <br />"shop drawing multi-transmittal" form. Such submittals will be given to the City