Laserfiche WebLink
<br />in a complete and final form at least thirty (30) days prior to any Contractor need <br />for review response or such other longer time that may be needed to allow time <br />for detailed review by the City or others. The Contractor should allow sufficient <br />time for the possibility of rejection of the submittal, needed revisions, and <br />resubmittal review time. <br />6.21.2 By submitting working drawings, product data, and samples, the Contractor <br />represents that it has determined and verified all materials, field measurements, <br />and related field construction criteria are in accordance with the Detailed Scope <br />of Work, and that the Contractor has checked and coordinated the information <br />contained within the submittal with the requirements of the Detailed Scope of <br />Work. The costs incurred by the City to review resubmitted working drawings, <br />product data, and samples may be offset from any monies due the Contractor <br />when the Contractor has failed to comply with this Subsection. <br />6.21.3 Review and approval by the City of the Contractor’s working drawings, product <br />data, or samples does not relieve the Contractor of responsibility for the <br />accuracy of dimensions and details. Likewise, any review and comments do not <br />relieve the contractor from complying with every requirement of the Job Order <br />drawings and specifications unless the Contractor has called written attention to <br />any deviations contained in the submittal and these deviations have been <br />reviewed and accepted. By omission of any feature, capability or part of any <br />item submitted the Contractor implies that these missing features, capabilities or <br />parts will be furnished exactly as required by the Job Order documents. Review <br />and approval shall not constitute acceptance by the City of the correctness or <br />adequacy of such submittals, nor shall it constitute a representation or warranty <br />by the City that the drawings will satisfy the requirements of the Job Order. The <br />review of a specific item shall not indicate approval of an assembly in which the <br />item functions. The City's review or approval of a submittal shall not relieve the <br />Contractor from responsibility for errors or omissions in the submittals. <br />6.21.4 Any Work delayed by reason of a properly rejected submittal is deemed to be <br />entirely the Contractor’s risk and will not be the basis for a claim by the <br />Contractor for additional compensation or an extension of Job Order Completion <br />Time. Drawings marked "subject to change" or the like will not be reviewed. <br />The City is not required to review submittals that depend for their review on <br />other submittals not yet submitted. <br />6.21.5 When resubmitting a submittal, the Contractor is to direct specific attention, in <br />writing or on the resubmittal itself, to all revisions it has made. <br />6.21.6 No portion of the Work requiring submittal of a working drawing, product <br />data, or sample is to be commenced until the submittal has been approved by <br />the City as provided in these General Conditions. All portions of the Work <br />involving submittals shall be performed in accordance with the approved <br />submittals. <br />6.22 Cutting, Fitting and Patching of Work