Laserfiche WebLink
<br />6.22.1 The Contractor will be responsible for all cutting, fitting, patching or such <br />other altering as may be required to complete the Work, or to make its <br />several parts fit together properly. <br />6.22.2 The Contractor will not damage or endanger any portion of the Work, other work <br />of the City, or that of any separate Contractor’s by cutting, fitting, patching or <br />other altering of any work, or by excavation. The Contractor will not alter any of <br />the work of the City or any separate Contractor without written authorization <br />from the City. <br />Inspection of the Work <br />6.22.3 The Project Manager or authorized representative shall have the right but not <br />the obligation to inspect the Work, and to reject and refuse all labor and <br />materials or methods of application, or any part thereof, which does not comply <br />in kind, quality or material with the requirements of the Detailed Scope of Work. <br />Any labor or material rejected, as not conforming to the Contract Documents <br />shall be promptly removed. Labor and materials which do so conform will be <br />furnished and delivered in place thereof; and if the Contractor refuses or <br />neglects to remove such rejected material or to rebuild any such rejected Work, <br />or otherwise correct the defects as the Project Manager directs, the City may <br />obtain, use and employ materials, labor, tools and implements to do the same <br />and the expense thereof will be deducted from moneys which may otherwise be <br />due or become due to the Contractor. <br />Uncovering of Work <br />6.22.4 If any portion of the Work should be covered prior to inspection called for by law <br />or as required by the Contract Documents, the Contractor will, upon request of <br />the Project Manager, uncover or remove the Work for inspection by the Project <br />Manager or other governmental representatives, and replace the Work to the <br />standard required by the Detailed Scope of Work, all at the Contractor’s expense. <br />6.22.5 If any other portion of the Work has been covered or completed, the Contractor <br />will, upon the request of the Project Manager, remove or uncover such Work for <br />the Project Manager's observation. The Contractor will subsequently restore <br />that portion of the Work to the standard required by the Detailed Scope of <br />Work at no additional costs to the City. <br />Correction of Work <br />6.22.6 The Contractor will, at no additional expense to the City, promptly correct all <br />Work which is defective or otherwise fails to conform to the requirements of <br />the Detailed Scope of Work. Such Work is to be corrected even though it was <br />previously inspected by the City, payment for it was included in a progress <br />payment, whether or not it was completed, and whether or not it was observed <br />before or after the date of Substantial Completion.