Laserfiche WebLink
10. Remote Annunciator - If a remote alarm annunciator is provided, verify operations ❑ ❑ ❑ <br />and that the correct information is being received. <br />Step 5: Fire Suppression Systems PASS FAIL N/A <br />Fire Sprinkler Systems: <br />1. Contractors - All sprinkler devices shall be tested with both the sprinkler and fire ❑ ❑ ❑ <br />alarm contractors present. <br />2. Flow Test - Test waterflow alarm by flowing water from the Inspectors Test Valve. <br />❑ ❑ ❑ <br />The alarm should sound no earlier than 20 seconds and no later than 90 seconds. <br />(Wet and dry systems) <br />3. Dry -Type Sprinkler Systems — Have constrictor demonstrate that both high and <br />❑ ❑ ❑ <br />low air pressure are supervised as required. The off -normal signal shall be initiated <br />when the pressure increases or decreases by 10 psi. <br />4. Exterior Horn/Strobe - Verify that a listed horn/strobe device is located on the <br />❑ ❑ ❑ <br />front exterior of the building in an approved location in close proximity to the <br />buildings address. Such device shall be activated by water flow actuation of the <br />automatic sprinkler system. <br />5. Control Valves - Close all electrically supervised sprinkler control valves to verify ❑ ❑ ❑ <br />supervisory alarm at the FACP within 2 turns of control wheel or, for Post Indicator <br />Valve (PIV) within 1/5 of valve control mechanism's travel distance. Then reopen <br />to verify "restore" signal. <br />Fire Pump: <br />PASS FAIL N/A <br />6. Pump Running - Verify that when the fire pump is running that the fire alarm goes ❑ ❑ ❑ <br />into alarm. <br />7. Control Valves - Close all electrically supervised fire pump control valves to verify ❑ ❑ ❑ <br />supervisory signal at the FACP. <br />Other Suppression Systems: <br />PASS FAIL <br />N/A <br />8. Type 1 Commercial Kitchen System - shall initiate an alarm signal by alarm <br />❑ ❑ <br />❑ <br />initiating devices installed in accordance with their individual listings. <br />9. Pre -Action Suppression System — If installed and if it has an independent control <br />❑ ❑ <br />❑ <br />panel it will require a separate NFPA 72 certificate from the building FACP. <br />10. Clean Agent Suppression System — If installed and if it has an independent control <br />❑ ❑ <br />❑ <br />panel it will require a separate NFPA 72 certificate from the building FACP. <br />Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-5 4.13.2020 1 Page 5 <br />