My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction Inc. 11/6/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Pellco Construction Inc. 11/6/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 1:20:41 PM
Creation date
11/6/2024 1:20:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction Inc.
Approval Date
11/6/2024
End Date
11/20/2024
Department
Procurement
Department Project Manager
Bert Cueva
Subject / Project Title
Repair of Screw Pump Upper Bearing located at the Water Pollution Control Facility
Tracking Number
0004579
Total Compensation
$27,343.12
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Emergency Screw Pump Repair_110524_SD <br />Final Audit Report 2024-11-06 <br />Created:2024-11-06 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAA9Wx5r7k7cI6pgzE2RvoLG9ZLVxuFT5-j <br />"Emergency Screw Pump Repair_110524_SD" History <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2024-11-06 - 6:27:33 PM GMT <br />Document emailed to Bert Cueva (bcueva@everettwa.gov) for approval <br />2024-11-06 - 6:28:05 PM GMT <br />Email viewed by Bert Cueva (bcueva@everettwa.gov) <br />2024-11-06 - 6:28:31 PM GMT <br />Document approved by Bert Cueva (bcueva@everettwa.gov) <br />Approval Date: 2024-11-06 - 6:28:37 PM GMT - Time Source: server <br />Document emailed to Mike Pellitteri (mikep@pellcoconstruction.com) for signature <br />2024-11-06 - 6:28:39 PM GMT <br />Email viewed by Mike Pellitteri (mikep@pellcoconstruction.com) <br />2024-11-06 - 6:43:15 PM GMT <br />Document e-signed by Mike Pellitteri (mikep@pellcoconstruction.com) <br />Signature Date: 2024-11-06 - 6:43:31 PM GMT - Time Source: server <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2024-11-06 - 6:43:34 PM GMT <br />Email viewed by Tim Benedict (TBenedict@everettwa.gov) <br />2024-11-06 - 6:47:07 PM GMT <br />Document approved by Tim Benedict (TBenedict@everettwa.gov) <br />Approval Date: 2024-11-06 - 6:47:24 PM GMT - Time Source: server <br />Document emailed to Cassie Franklin (cfranklin@everettwa.gov) for signature <br />2024-11-06 - 6:47:27 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.