My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction Inc. 11/6/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Pellco Construction Inc. 11/6/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 1:20:41 PM
Creation date
11/6/2024 1:20:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction Inc.
Approval Date
11/6/2024
End Date
11/20/2024
Department
Procurement
Department Project Manager
Bert Cueva
Subject / Project Title
Repair of Screw Pump Upper Bearing located at the Water Pollution Control Facility
Tracking Number
0004579
Total Compensation
$27,343.12
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Email viewed by Cassie Franklin (cfranklin@everettwa.gov) <br />2024-11-06 - 8:37:08 PM GMT <br />Document e-signed by Cassie Franklin (cfranklin@everettwa.gov) <br />Signature Date: 2024-11-06 - 8:37:17 PM GMT - Time Source: server <br />Document emailed to Marista Jorve (mjorve@everettwa.gov) for signature <br />2024-11-06 - 8:37:20 PM GMT <br />Email viewed by Marista Jorve (mjorve@everettwa.gov) <br />2024-11-06 - 9:07:18 PM GMT <br />Document e-signed by Marista Jorve (mjorve@everettwa.gov) <br />Signature Date: 2024-11-06 - 9:07:25 PM GMT - Time Source: server <br />Agreement completed. <br />2024-11-06 - 9:07:25 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.