Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 11/22/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2211-022 <br /> 3200 Cedar Street, 2nd Floor Associated PW Permit#: PW2211-012 <br /> EV E R E T T Everett, WA 98201 Planning Reference#: REV1122-025 <br /> everettwa.gov/permits Public Works Fee: $27,417.45 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BHEND MARC PACIFIC RIDGE- DRH LLC <br /> 4126 SERENE WAY 17921 BOTHELL EVERETT HWY STE 100 <br /> LYNNWOOD,WA 98037 BOTHELL,WA 98012 <br /> PHONE: PHONE:4254382945 <br /> SITE ADDRESS:9908 18TH AVE W TAX PARCEL ID#:00480600102000 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE WORK FOR BENTON SQUARE <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8. As-builts of water,sanitary sewer,and storm systems are required to be submitted to the PW Inspector per City"Design and Construction <br /> Standards and Specifications for Development" prior to the utilities being brought online.Water,sewer,and storm as-builts may be <br /> submitted separately as they become available.Water as-builts MUST be submitted prior to the Water Department making connection to <br /> the public water system and putting the new water main in service. It is encouraged for the water system to be surveyed prior to cover. <br /> 9. On-site water and sewer mains will be staked within an easement to the City.The easement documentation must be recorded by the <br /> project team with a copy of the recorded document submitted to the City prior to final approval/close out of the permit. <br /> 10. A Hold Harmless Agreement with the City shall be recorded for the public runoff area that is flowing to private stormwater facilities. <br /> 11. A Declaration of Covenant for Stormwater BMPs shall be submitted to the City prior to final approval/close out of the permit. <br /> 12. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 13. A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 14. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. <br /> Please allow up to one week for the inspection to be scheduled. <br /> 15. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 16. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this <br /> permit. <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />