My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9908 18TH AVE W 2024-12-03
>
Address Records
>
18TH AVE W
>
9908
>
9908 18TH AVE W 2024-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 10:16:37 AM
Creation date
11/6/2024 1:27:19 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9908
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
731
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 11/22/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2211-022 <br /> 3200 Cedar Street, 2"d Floor Associated PW Permit#: PW2211-012 <br /> EV E R E T T Everett, WA 98201 Planning Reference#: REV1122-025 <br /> everettwa.gov/permits Public Works Fee: $27,417.45 <br /> WASHINGTON PermitSeryices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> PERMIT FEE BREAKDOWN: <br /> Driveway Apron(Residential x2).............................................$50.00 <br /> Paving(16,880 SF)..................................................................$84.40 <br /> PW Plan Review................................................................$5,465.24 <br /> PW Site Inspection..........................................................$10,930.47 <br /> Stormwater System Development Fee(40,623 SF) ........$10,887.34 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br /> all claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other <br /> right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br /> thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br /> This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration <br /> date 180 days to keep the permit open while work is active. <br /> Page 2 of 2 <br /> —APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.