Laserfiche WebLink
GENERAL NOTES PLUMBING NOTES ABBREVIATIONS <br /> SYMBOLS <br /> 1. REFERENCE TO RELATED WORK:"REP INDICATIONS DENOTE WORK 1. CONNECTIONS:PROVIDE PLUMBING FIXTURE CONNECTIONS TO ABV ABOVE <br /> COVERED ELSEWHERE(ARCHITECTURAL,STRUCTURAL,CIVIL, BUILDING WASTE,VENT,COLD WATER,AND HOT WATER SYSTEM IN GENERAL PIPE SYMBOLS AFF ABOVE FINISHED FLOOR AREA OF WORK <br /> ELECTRICAL,LANDSCAPE,OR KITCHEN),OR ITEM BASED ON A SPECIFIC ACCORDANCE WITH DRAWINGS,MANUFACTURER'S RECOMMENDATIONS, AHJ AUTHORITY HAVING JURISDICTION <br /> MANUFACTURER'S DIMENSIONS(VERIFY). AND LOCAL CODES.CONNECT TO EACH FIXTURE,EQUIPMENT,ETC.WITH ARCHITECTURAL BACKGROUND(THIN n TOP PIPE CONNECTION BFF BELOW FINISHED FLOOR <br /> ALL ACCESSORIES,VALVES,VACUUM BREAKERS,REGULATORS,UNIONS, LINE) BOH BACK OF HOUSE <br /> 2. ELECTRICAL CHARACTERISTICS:REFER TO ELECTRICAL DRAWINGS FOR ETC.AS REQUIRED AND AS RECOMMENDED BY THE MANUFACTURERS. "' BOTTOM PIPE CONNECTION BP BOOSTER PUMP <br /> ELECTRICAL CHARACTERISTICS(VOLTAGES,ETC.OF MECHANICAL REFER TO PLUMBING FIXTURE CONNECTION SCHEDULE ON PLANS. Y BTUH BRITISH THERMAL UNIT PER HOUR <br /> EQUIPMENT,UNLESS OTHERWISE INDICATED. NEW PIPING(HEAVY LINE) 0 PIPE TURNING UP BV BALANCING VALVE <br /> 2. HOT AND COLD:WATER PIPING CONNECTION TO EACH FIXTURE SHALL BE CAP CAPACITY <br /> 3. CODES:COMPLETE INSTALLATION OF THE PLUMBING SYSTEM SHALL BE COLD WATER ON THE RIGHT HAND SIDE AND HOT WATER ON THE LEFT EXISTING PIPING(THIN LINE) PIPE TURNING DOWNIDROP CB CATCH BASIN , z <br /> PER THE APPLICABLE BUILDING,MECHANICAL,ENERGY,PLUMBING,FIRE, HAND SIDE. CD CONDENSATE DRAIN O z <br /> AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. ] PIPE CAP CFF CAPPED FOR FUTURE a O <br /> 3. HOT WATER:NON-CIRCULATING HOT WATER PIPE SHALL NOT EXCEED 10' EXISTING WORK TO BE REMOVED CFM CUBIC FEET PER MINUTE 1 a N <br /> L <br /> 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED ON FINAL UNLESS OTHERWISE SHOWN ON DRAWINGS. PIPE PLUG CI CAST IRON „' N w <br /> STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ROUTING ALL CLG CEILING,COOLING w of <br /> EQUIPMENT,PIPING,ETC. 4. CLEANOUTS:PROVIDE CLEANOUTS PER CURRENT UPC AND AS - - MATCHLINE OR PROPERTY LINE UNION CO CLEANOUTS p <br /> 0 <br /> A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH STRUCTURAL. REQUIRED BY LOCAL JURISDICTIONS.CLEANOUTS SHALL BE LOCATED IN COMB COMBUSTION <br /> B. COORDINATE FINAL LOCATION AND ROUTING WITH CEILING,LIGHTS, WALLSIFLOORS WHERE THEY ARE NOT HIGHLY VISIBLE.FLOOR CONNECTION TO EXISTING FLANGE CONT CONTINUE,CONTROL <br /> WALLS,FIRE SPRINKLER PIPING,AND OTHER TRADES WORK. CLEANOUTS IN CARPETED AREAS TO BE FITTED WITH CARPET INSERTS. CONTR CONTRACTOR Q <br /> C. INCLUDE ADDITIONAL OFFSETS,ELBOWS,ROUTING,EQUIVALENT LOCATIONS SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL.NOTE: WYE STRAINER COTG CLEANOUTS TO GRADE p <br /> DUCT SIZING EXCHANGE,RELOCATING,ETC.AS REQUIRED FOR A NOT ALL CLEANOUTS ARE SHOWN ON THE PLUMBING DRAWINGS. CV CHECK VALVE <br /> COMPLETE OPERATING MECHANICAL SYSTEM. WYE STRAINER WITH CAPPED HOSE CW COLD WATER <br /> D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO THE 5. SHUT-OFFS:PROVIDE 1/4 TURN BALL VALVE ANGLE STOP SHUT-OFF DETAIL IDENTIFICATION END BLOWDOWN VALVE D DIAMETER VICINITY PLAN <br /> OWNER. VALVES AND BRAIDED STAINLESS STEEL FLEX CONNECTORS AT HOT DF DRINKING FOUNTAIN <br /> AND COLD WATER SUPPLY TO EACH FIXTURE.EXCEPTION:PROVIDE # DETAIL NUMBER ��� BALL VALVE DFU DRAIN FIXTURE UNITS N z <br /> 5. PLUMBING CONTRACTOR SHALL LOCATE AND COORDINATE EXACT SCREWDRIVER STOPS AT BATHISHOWERS. DI DUCTILE IRON PROPERTY ADDRESS <br /> DRAWING/SHEET NUMBER n,.� <br /> LOCATION OF ALL PLUMBING EQUIPMENT WITHIN THE STRUCTURE. # �N - BALL VALVE DIM DIMENSION NORTHSHORE CHRISTIAN CHURCH <br /> 6. TRAP ARMS:PROVIDE TRAP ARMS SUCH THAT THE MAXIMUM LENGTH DN DOWN 5700 23RD DR WEST <br /> 6. ACCESS DOORS:COORDINATE WITH ARCHITECT AND LOCATE ALL WILL NOT EXCEED CODE REQUIREMENTS. -D.q- GLOBE VALVE DS DOWN SPOUT EVERETT,WA 98203 <br /> ACCESS DOORS ON SHOP DRAWINGS PRIOR TO BEGINNING OF DWG DRAWING 0� O <br /> CONSTRUCTION.ACCESS DOORS IN FIRE RATED STRUCTURE SHALL BE 7. ADA INSULATION:AT PLUMBING PIPING EXPOSED UNDER LAVATORIES, EQUIPMENT �'� CHECK VALVE (E) EXISTING ASSESSORS PARCEL NUMBER <br /> FIRE RATED.VERIFY R PRIOR <br /> TO BID DOOR LOCATIONS WITH GENERAL INSULATE THE EXPOSED PIPING AND TRAPS WITH PRODUCT �\ BALANCING OR PLUG VALVE EEFF LEC ELECTRIC Y 28040200200800&28040200200801 �O� •`G'�\ <br /> CONTRACTOR PRIOR TO BIDDING. SPECIFICALLY DESIGNED FOR THIS APPLICATION MEETING NT. I J! TYPICAL EQUIPMENT DESIGNATION [_V <br /> REQUIREMENTS.PROVIDE HANDI-LAV GUARD OR EQUIVALENT.OFFSET ICJ EQUIV EQUIVALENT LEGAL DESCRIPTION ,C <br /> 7. ROOF PENETRATIONS:SEE ARCHITECTURAL DRAWINGS FOR ROOF CAP, P-TRAPS TO CLEAR WHEELCHAIR ACCESS. HWCP-1 \ BUTTERFLY VALVE EWC ELECTRIC WATER COOLER LOT 3E OF SEAWAY CENTER SEVEN BSP REC.AF NO. <br /> ROOF CURB,ROOF DRAIN,OVERFLOW DRAINS AND VTR DETAILS. EWH ELECTRIC WATER HEATER 9807215008&BEING PTN OF S 112 N 1/2 OF SEC 8. WATER HAMMER ARRESTORS:PROVIDE AT THE END OF HOT AND COLD ENT EXTERIOR,EXTERNAL O <br /> ("j <br /> 8. EXPOSED PIPING:PROVIDE CHROME PLATING FOR EXPOSED PIPING IN WATER LINES SERVING TWO OR MORE FIXTURES;SIZE IN ACCORDANCE /\~ FLEXIBLE CONNECTION IN PIPING F FAHRENHEIT APPLICABLE CODES <br /> FINISHED ROOMS. WITH PLUMBING AND DRAINAGE INSTITUTE(PDI)REQUIREMENTS.WATER PIPING FCO FLOOR CLEANOUTS - 2018 INTERNATIONAL BUILDING CODE(IBC)& <br /> HAMMER ARRESTORS ARE REQUIRED FOR QUICK CLOSING VALVES, FD FLOOR DRAIN WASHINGTON STATE AMENDMENTS <br /> 9. PENETRATIONS:PROVIDE ESCUTCHEON PLATES FOR EXPOSED PIPING SUCH AS LAUNDRY WASHERS,FLUSH VALVES(PUBLIC TOILETS),ETC. SANITARY SEWER FDC FIRE DEPARTMENT CONNECTION - 2018 INTERNATIONAL MECHANICAL CODE(IMC)& <br /> PENETRATIONS AND SHEET METAL FLASHING FOR EXPOSED DUCTWORK fir- PRESSURE REDUCING VALVE(PRV) FF FINISHED FLOOR WASHINGTON STATE AMENDMENTS <br /> PENETRATIONS. 9. TRAP PRIMERS AS SPECIFIED:PROVIDE TRAP PRIMERS AND PIPING FOR --------- VENT PRV FLR FLOOR - 2020 NATIONAL ELECTRIC CODE(NEC)&WASHINGTON <br /> FLOOR DRAINS,FLOOR SINKS,AREA DRAINS&HUB DRAINS.ARRANGE SD STORM DRAIN FPM FEET PER MINUTE STATE AMENDMENTS <br /> 10. SHAFT AND PLENUM CONNECTIONS:SEAL CONNECTIONS TO AIR SHAFTS PIPING TO ACHIEVE EQUAL FLOW TO EACH DRAIN AND FLOOR SINK FOR 0In- AUTOMATIC CONTROL VALVE,2-WAY FPS FEET PER SECOND - 2021 WASHINGTON STATE ENERGY CODE(WSEC) - <br /> AIRTIGHT.PROVIDE AIRTIGHT SEAL AROUND PENETRATIONS IN AIR TRAP PRIMERS SERVING MULTIPLE DRAINS AND FLOOR SINKS. OD OVERFLOW DRAIN �QQ FS FLOOR SINK - 2018 UNIFORM PLUMBING CODE(UPC)&WASHINGTON O I O <br /> PLENUMS. COORDINATE EXACT LOCATIONS WITH ARCHITECT&ELECTRICAL <br /> CD CONDENSATE DRAIN AUTOMATIC CONTROL VALVE,3-WAY FT FEET STATE AMENDMENTS <br /> ENGINEER. FU GALLONS SCOPE <br /> ENGINEERING,INC <br /> 11. LIGHT FIXTURE CLEARANCE:COORDINATE LOCATIONS OF MECHANICAL - COLD WATER(CW) GAL GALLONS SCOPE OF WORK not amHnvew,swreeoz <br /> WORK TO PROVIDE CLEARANCES OVER LIGHTING FIXTURES FOR 10, P-TRAPS:ALL EXPOSED P-TRAPS SHALL BE CHROME-PLATED BRASS. GO GARAGE DRAIN PLUMBING TO SUPPORT TENANT IMPROVEMENT IN AN EXISTING 19 LVNM400D,WASB <br /> ID RELIEF VALVE 20636633E3' <br /> REMOVAL AND REPLACEMENT. P-TRAPS SERVING HANDICAPPED COUNTER TOP LAVATORIES SHALL BE -- HOT WATER(HW),POTABLE,120°F GM GAS METER BUILDING.ALTERATIONS TO INCLUDE WATER SUPPLY,WASTE, ae-eaeo.aaoze <br /> INSULATED. GPG GRAINS PER GALLON AND VENT PIPING TO NEW PLUMBING FIXTURES. co-im <br /> 12. CABLE TRAYS:PIPING INSTALLED ADJACENT TO ELECTRICAL CABLE - -- -140 HOT WATER,POTABLE,TEMPERATURE K1h GPM GALLONS PER MINUTE <br /> TRAYS SHALL ALLOW MINIMUM ACCESS OF 6"ABOVE AND TO THE SIDE 11. THROUGHOUT THE PROJECT PROVIDE BALL VALVES.GATE VALVES OTHER THAN 120°F ( BALANCINGNEASURING VALVE GWH GAS WATER HEATER <br /> OF CABLE TRAYS. SHALL NOT BE USED.NO EXCEPTIONS. HB HOSE BIBB Drawing Index <br /> HOT WATER CIRCULATING(HWC),POTABLE, REDUCER HD HEAD <br /> Sheet Number Sheel Ttle <br /> 13. MOTORS:COMPLY WITH ENERGY CODE ENFORCED BY AHJ FOR MINIMUM 12. HOT WATER RECIRCULATING BALANCING VALVES SHOULD BE BELL& 120°F HDR HUB DRAIN <br /> EFFICIENCIES UNDER FULL LOAD. GOSSETT CIRCUIT SETTER(WATTS OR EQUAL)WITH INTEGRAL READOUT DIRECTION OF FLOW HEDV HOSE END DRAIN VALVE P0.0 GENERAL NOTES,LEGENDS,&DRAWING INDEX - - <br /> PORTS,ADJUSTMENT KNOB,DRAIN CONNECTION,AND POSITIVE - --- -140 HOT WATER CIRCULATING,POTABLE, HORIZ HORIZONTAL <br /> TEMPERATURE OTHER THAN 120°F P0.1 PLUMBING SCHEDULES <br /> 14. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT:VERIFY SHUTOFF. �� PIPE ANCHOR HP HORSEPOWER p <br /> p p w <br /> PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS HPCW HIGH PRESSURE COLD WATER P1.0 SITE PLAN <br /> w <br /> CLEARANCES CAN BE MET.COORDINATE LOCATIONS OF MECHANICAL 13. DISASSEMBLY PROVISIONS:PROVIDE UNIONS OR FLANGES AT PIPING G LOW PRESSURE NATURAL GAS PIPE ALIGNMENT GUIDE HW HOT WATER P2.0 BLDG B,UNDERSLAB WASTE&VENT PLAN U 0 <br /> WORK AND WORK OF OTHER TRADES TO PROVIDE ACCESS CLEARANCES CONNECTIONS TO EQUIPMENT,COILS,TRAPS,CONTROL VALVES,AND HWC HOT WATER RE-CIRCULATION rn w a <br /> MPG MEDIUM PRESSURE NATURAL GAS P2.1 BLDG B,LEVEL 1 WASTE&VENT PLAN <br /> FOR SERVICE AND MAINTENANCE. OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR MAINTENANCE. I PS PIPE SUPPORT HWCP HOT WATER CIRCULATION PUMP p U Q <br /> HWR HOT WATER RETURN P2.2 BLDG C,UNDERSLAB WASTE&VENT PLAN <br /> COORDINATION REQUIREMENTS 14. REDUCERS:PROVIDE AS REQUIRED FROM LINE PIPE SIZE TO c VALVE STATION OR ASSEMBLY HWST HOT WATER STORAGE TANK <br /> EQUIPMENT,TRAP,COIL,AND CONTROL VALVE CONNECTION SIZES. HX HEAT EXCHANGER P2.3 BLDG C,LEVEL 1 WASTE&VENT PLAN <br /> 1. IRRIGATION SYSTEM:COORDINATE IRRIGATION WATER DEMAND, ICW INDUSTRIAL COLD WATER P3.1 BLDG B,LEVEL 1 SUPPLY PLAN <br /> MINIMUM WATER PRESSURE REQUIREMENTS&CONTROL CABINET 15. VALVE TAGS:PROVIDE VALVE TAGS PER SPECIFICATIONS TO IDENTIFY ID INDIRECT DRAIN,PIPE TO DRAIN ID INDIRECT DRAIN,INSIDE DIAMETER P3.3 BLDG C,LEVEL 1 SUPPLY PLAN <br /> LOCATIONS WITH IRRIGATION CONTRACTOR. VALVE AND THE AREA IT SERVES. IE INVERT ELEVATION <br /> IHW INDUSTRIAL HOT WATER P4.0 WASTE&SUPPLY DIAGRAMS <br /> 2. GAS:CONTRACTORIGAS COMPANY SHALL FINALIZE GAS METER AND GAS 16. OFFSETS:PROVIDE FOR BRANCH LINES TO EQUIPMENT. POINT OF CONNECTION IN INCH pq,i WASTE 8 SUPPLY DIAGRAMS <br /> SERVICE LOCATIONS.INSTALL SEISMIC GAS SHUT OFF VALVE PER GAS KS KITCHEN SINK <br /> COMPANY REGULATIONS. 17. ALL TEMPERATURE MIXING VALVES SHALL COMPLY WITH ASSE-1070 O O KW KILOWATT P5.0 DETAILS <br /> SAFETY STANDARDS. RD OD ROOF DRAIN,OVERFLOW DRAIN L LONG,LENGTH P3.0 BLDG B,UNDERSLAB SUPPLY PLAN <br /> 3. UTILITIES:COORDINATE WITH SITE UTILITY CONTRACTOR AND CIVIL LAV LAVATORY <br /> DRAWINGS FOR UTILITY CONNECTIONS AND EXTENSIONS. 18, PROVIDE PIPE MARKER WITH DIRECTION OF FLOW.LABEL"NON-POTABLE LB POUND P3.2 BLDG C,UNDERSLAB SUPPLY PLAN <br /> WATER DO NOT DRINK"CLEARLY ON NON-POTABLE WATER PIPING. ® FLOOR DRAIN M WATER METER <br /> 4. ROOF DRAINAGE:COORDINATE WITH GENERAL CONTRACTOR FOR ROOF MBH THOUSAND BTU PER HOUR <br /> DRAIN AND OVERFLOWS,SCUPPER DRAINS,AND CONDENSATE DRAINS. 19. PROVIDE EXPANSION LOOPS/EXPANSION JOINTS IN PIPING PER 2018 UPC MECH MECHANICAL <br /> TABLE 313.3 AND MANUFACTURER INSTALLATION INSTRUCTIONS. HOSE BIBB MCA MIN.CIRCUIT AMPACITY ` <br /> 5. PLUMBING FIXTURES&EQUIPMENT:COORDINATE EXACT LOCATION OF MOCP MAX.OVER CURRENT PROTECTION r <br /> ALL PLUMBING FIXTURES&EQUIPMENT WITH ARCHITECTURAL AND 20. PROVIDE APPROVED PIPE HANGERS&PIPE SUPPORTS IN ACCORDANCE S BREAK IN PIPING OR DUCTWORK MPG MEDIUM PRESSURE GAS <br /> OTHER TRADES DOCUMENTS. WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND 2018 UPC MTD MOUNTED N <br /> TABLES 313.3&313.6.SUBMIT FOR APPROVAL. GM GAS METER (N) NEW ui m <br /> 6. PIPING:COORDINATE EXACT LOCATION OF ALL STRUCTURAL FRAMING& NC NORMALLY CLOSED Q w <br /> FOOTINGS AND FINALIZE THE EXACT ROUTING OF ALL PIPES WITH 21, DIELECTRIC UNIONS:PROVIDE AT CONNECTIONS OF DISSIMILAR PIPE. NO NORMALLY OPEN ~ <br /> STRUCTURAL ENGINEER AT THE SITE PRIOR TO AND DURING THE M� INLINE WATER METER OD OUTSIDE DIMENSION/DIAMETER Q rn o <br /> CONSTRUCTION.COORDINATE UNDER GRADE PIPING&FOUNDATION 2.2. PIPING&EQUIPMENT SUPPORTSIHANGERS&SEISMIC RESTRAINTS TO OVERFLOW DRAIN/DECK DRAIN U rn m <br /> DRAINAGE PIPING WITH CIVIL ENGINEER. BE DESIGNED BY DESIGN BUILT CONTRACTOR. PUMP OPD OVER PRESSURE DEVICE ¢3 <br /> P PUMP <br /> 7. ADJUSTMENTS:ALL EQUIPMENT,MOTORS,FANS GAS BURNERS,IGNITION 23. FLOOR DRAINS OR SIMILAR TRAPS DIRECTLY CONNECTED TO THE (� PD PRESSURE DROP,PLANTER DRAIN O o <br /> DEVICES,DRIVES,ETC.SHALL BE ADJUSTED AND BALANCED TO DRAINAGE AND SUBJECT TO INFREQUENT USE SHALL BE PROVIDED WITH Y PRESSURE GAUGE POC POINT OF CONNECTION w v 3 N <br /> w <br /> OPERATE AT SPECIFIED RATINGS AS REQUIRED FOR THIS PROJECT SITE AN APPROVED AUTOMATIC MEANS OF MAINTAINING THEIR WATER SEALS PRV PRESSURE REDUCING VALVE o z 0 <br /> AND ACCOUNTING FOR ELEVATION ABOVE SEA LEVEL. IN ACCORDANCE WITH 2O18 UPC 1007.0. 4 PRESSURE RELIEF VALVE O <br /> T THERMOMETER PSIG POUNDS PER SQUARE INCH GAUGE a <br /> 8. APPROVALS:MECHANICAL AND PLUMBING EQUIPMENT SHALL BE 24. INSULATION MATERIAL SHALL MEET CITY OF EVERETT QUALITY PSS PUMPED SANITARY SEWER = V <br /> APPROVED FOR INSTALLATION IN THE PROJECT LOCATION AND SHALL STANDARDS. t PIT PRESSUREITEMPERATURE TEST PORT PSW PUMPED SANITARY WASTE ''/^� c Z <br /> HAVE ALL CERTIFICATIONS AND RATINGS TO MEET ALL ENERGY, PW PUMPED WASTE vJ <br /> POLLUTION,ENVIRONMENTAL,SEISMIC,APPLICABLE CODES AND 25. ALL PIPING AND DUCTWORK SHALL BE INSULATED CONSISTENT WITH RD ROOF DRAIN <br /> REGULATIONS.THE CONTRACTOR SHALL COORDINATE WITH THE 2021 WASHINGTON STATE ENERGY CODE. REDUCED PRESSURE BACKFLOW PREVENTER REF REFERENCE�4\\�� <br /> MANUFACTURE SUPPLIERS AND SHALL INCLUDE ALL COSTS REQUIRED RPBP REDUCED PRESSURE BACKFLOW /r/ -o O <br /> TO MEET THE BID DOCUMENTS. 26. BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH 2O18 RPBP PREVENTER m V! Z <br /> UPC 701.0 AND 903.0. SCH SCHEDULE O c4 <br /> 9. FIRE PROTECTION:CONTRACTOR SHALL PROVIDE A FULLY DESIGNED �Q\I\D_ DOUBLE CHECK VALVE ASSEMBLY SCW SOFTENED COLD WATER Z o M W <br /> FIRE PROTECTION SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA AND 27. ALL SANITARY SYSTEM MATERIAL SHALL BE LISTED BY AN APPROVED DCVA SD STORM DRAIN QJ W W <br /> LOCAL CODES.PROVIDE DESIGN,PERMITS,MATERIALS,INSTALLATION, LISTING AGENCY. SF SQUARE FOOT <br /> TESTING AND ALL OTHER FOR A FULLY OPERATIONAL SYSTEM.LOCATIONS CATCH BASIN SGSV SEISMIC GAS SHUT-OFF VALVE O 'Z <br /> OF ALL PIPING TO BE COORDINATED WITH OTHER TRADES. 28. MATERIAL EXPOSED WITHIN A DUCT OR PLENUM SHALL COMPLY WITH SH SHOWER w 0 <br /> 2018 IMC 602.2.1. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TRENCH DRAIN SO STORM OVERFLOW O Z <br /> 10. PRIOR TO PIPING INSTALLATION:PLUMBING CONTRACTOR TO SP STATIC PRESSURE/SUMP PUMP <br /> COORDINATE PIPING LAYOUT WITH ALL OTHER TRADES. 29. PLUMBING FIXTURES AND FITTINGS SHALL COMPLY WITH CITY OF SS STAINLESS STEELISANITARY SEWER d W <br /> EVERETT WATER CONSERVATION STANDARDS. ------ EMERGENCY GAS SHUT-OFF VALVE SSS SIDE SANITARY SEWER <br /> 11. ACCESS:COORDINATE ALL ACCESS LOCATIONS WITH GENERAL STD STANDARD DATE: <br /> CONTRACTOR AND ARCHITECT TO ENSURE ALL REQUIRED ACCESS 30. CONTRACTOR SHALL PROVIDE FIRESTOPPING AT PENETRATIONS AS SO SQUARE 03/19/2024 <br /> HATCHES,ACCESS PANELS&ACCESS COVERS ARE PROVIDED. NECESSARY TO RETAIN THE FIRE RATING OF ALL ASSEMBLIES.ALL T GAS SEISMIC SHUT-OFF VALVE TD TRENCH DRAIN <br /> WORK SHALL BE IN COMPLIANCE WITH CODE REQUIREMENTS FOR THE TMV THERMOSTATIC MIXING VALVE <br /> 12. PROVIDE WATER TIGHT SEALS FOR ANY PIPING PENETRATING THE BUILDING CONSTRUCTION TYPE. WASHER BOX TP TRAP PRIMER SHEETTITLE: <br /> EXTERIOR FOUNDATION WALLS OR SLABS. TYP TYPICAL GENERAL NOTES, <br /> 13. ANY DISCREPANCIES SHOULD BE REPORTED TO THE ARCHITECT ® GREASE INTERCEPTOR UH UNIT HEATERJOIN UNLESS OTHERWISE NOTED LEGENDS,R DRAWING <br /> IMMEDIATELY. UR URINAL INDEX <br /> V VENT <br /> 14. PROVIDE FIRE PROOFING FOR ALL PIPING PENETRATING FIRE BARRIER VTR VENT THRU ROOF <br /> WALLS OR FLOOR SLABS. W WASTE,WATT,WIDE <br /> WC WATER CLOSET <br /> WCO WALL CLEANOUTS <br /> WSFU WATER SUPPLY FIXTURE UNITS SHEET NO. <br /> P0.0 <br />