Laserfiche WebLink
K ENGINEERS INC. <br /> TO UNIT SUBSTATION NUS-H4 208 Third Street <br /> Lynden, WA. 98264 CONTINUED ON DRAWING E6.3 Bus. (360) 354-4757 W 0 <br /> ^ FAX (360) 354-6794 <br /> LS CR NORMAL/OPT EQ TO SWBD MSB-G IN PARKING t Uj <br /> B B TO FIRE PUMP GARAGE. W d <br /> Z <br /> rn <br /> Z U <br /> 3750/4200/4688KVA, <br /> KNAN/KNAN-65/KNAF m L <br /> 12.7KV:480Y/277 pM O <br /> _ 30,4W,5.75%Z �� 0 Q <br /> T cr 1000AT� l 1000AT cr SOOAF cr 600AF cr 60OAF(� I 3200AF cr 600AF cr 600AF <br /> cr 225AT 1600AT 1200AT 3000AT 1200AT 1000AT <br /> SA <br /> K 5000AF <br /> �A 5000AT <br /> 600AS <br /> 600AS 250AF :o <br /> K K V v G <br /> TO UNIT SUBSTATION NUS-Hi N.C. �I \1 <br /> A N.O. B = <br /> 2727 Oakes Ave. <br /> NUS-H2 HOSPITAL NORMAL POWER Swte 100 <br /> 5000A BUS(LEVEL B-SOUTH) Everett,WA 98201 <br /> 12.47kV//480Y/277V 30 4W <br /> 100,000 AIC®480V REVISIONS <br /> SERVICE ENTRANCE RATED <br /> B B B B <br /> R. <br /> 0 tip.oe A�t 4 <br /> MEDIUM VOLTAGE FEEDER SCHEDULE v�, �r <br /> TO CENTRAL PLANT 1'i °o I <br /> G FEEDER COPPER CONDUCTORS FEEDER a y <br /> TYPE <br /> RACEWAY WIRE AMPACITY 44794 ,�n\4 <br /> o R <br /> .n tsTE4tiO <br /> A 6" (3)#750kcmil 15KV,MV-105 447 �S57aNat�T'c't <br /> 133%ERR,(1)#4/OG 600V XHHW (NOTE 1) <br /> �--51ERVICE DISCONNECT SWITCHES B 5" (3)#350kcmil 15KV,MV-105 415 <br /> 133%ERR,(1)#1/OG 600V XHHW <br /> (3)#4/0 15KV,MV-105 co <br /> TOWER"B" 600AF 300AS CUP"A" 300AS CUP"B" 600AS TOWER"A" C 4 133%ERR,(1)#1/OG 600V XHHW 315 <br /> N.C.G 600AS N 0 600AS N C 600AS N.C. 600AS <br /> 2E (2)4" (3)350kcmil 5KV,MV-105 830 <br /> 133%EPR,(1)#1/OG,600V XHHW IN EA. \I <br /> JJ L L 3E1 (3)4" (3)350kcmil 5KV,MV-105 810 X <br /> SERVICE POINT SERVICE POINT 133%EPR,(1)#2/OG,600V XHHW IN EA. (NOTE 1) <br /> A A A A A A 3E2 (3)4" (3)350kcmil 5KV,MV-105 873 <br /> 11 <br /> A 133%EPR,(1)#2/OG,600V XHHW IN EA. (NOTE 1) <br /> F 51. (3)500kcmil 5KV,MV-105 470 •� <br /> (2)6"RO 133%ERR,(1)#1/OG,600V XHHW (NOTE 2) <br /> TO EXISTING UTILITY COMPANY F1 5" (3)500kcmil 5KV,MV-105 348 <br /> EQUIPMENT ON SITE 133%ERR,(1)#1/OG,600V XHHW (NOTE 1) <br /> FOR FUTURE SERVICE TO Q <br /> EXISTING COLBY CAMPUS <br /> BUILDINGS WEST OF HOSPITAL NOTE 1: FEEDER AMPACITY BASED ON DUCT BANK STEADY STATE <br /> TOWER.REFER TO SITE PLAN (1)6"RO —2 THERMAL/AMPACITY ANALYSIS. <br /> SHEET E1.02 NOTE 2: FEEDER AMPACITY BASED ON ONE CIRCUIT IN DUCT BANK <br /> PER NEC TABLE 310.77. <br /> TO EXISTING UTILITY COMPANY/ :3F—Vill <br /> N <br /> EQUIPMENT ON SITE <br /> mco <br /> so a °' <br /> 1 1 a <br /> o 3 <br /> " m <br /> P.U.D.SW#4 P.U.D.SW#5 L P T O.U.D.SW#6 L E (-4 m <br /> n <br /> P.U.D.PRIMARY P.U.D.PRIMARY P.U.D.PRIMARY 1..� T W <br /> PM1 METER EQUIPMENT PM2 METER EQUIPMENT PM3 METER EQUIPMENT <br /> 1 1 III"0 2297 <br /> KL <br /> EQUIPMENT aHcarco ar SO <br /> 1 1 1 1 LOCATED IN <br /> P.U.D. <br /> SWITCH <br /> ROOM AT PERMIT SET <br /> PARKING <br /> GARAGE 8-11-24 <br /> L L L L L PARTIAL PRIMARY POWER RISER DIAGRAM - NORMAL SYSTEM ELECTRICAL - <br /> P.U.D.SW#1 P.U.D.SW#2 P.U.D.SW#3 POWER SYSTEM <br /> RISER DIAGRAM <br /> UTILITY#2 UTILITY#3 UTILITY#1 <br /> NORTON FEEDER DELTA FEEDER 1OTH ST.FEEDER E 6.1 <br /> 12.47KV 12.47KV 12.47KV <br />