Laserfiche WebLink
City of Everett <br />Dorn Ave Drainage Improvements <br />Fee Estimate - Final Draft <br />Otak Project # 21001B <br />Task Description <br />Total Otak <br />Hours <br />Total Otak <br />Budget by <br />Task <br />Geotechnical <br />Subconsultant Total <br />1.0 Project Management and Coordination <br />1.1 Coordination with the City 128 $24,582.00 $24,582.00 <br />1.2 Project Management Plan 20 $4,384.00 $4,384.00 <br />1.3 Design Coordination Meetings with the City 24 $4,448.00 $4,448.00 <br />1.4 Project Monitoring and Reporting 36 $7,277.63 $7,277.63 <br />2.0 Site Investigation <br />2.1 Desktop Review 34 $5,784.00 $5,784.00 <br />2.2 Site Reconnaissance 40 $7,464.00 $7,464.00 <br />3.0 Topographic Survey and Basemap <br />3.1 Survey and Basemapping 182 $23,044.00 $23,044.00 <br />3.2 Boundary Survey 62 $10,916.00 $10,916.00 <br />3.3 Property and Easement Acquisition Support 94 $17,660.00 $17,660.00 <br />4 Drainage Analysis <br />4.1 Hydrologic and Hydraulic Model Updates 44 $8,104.00 $8,104.00 <br />4.2 H&H Memorandum 22 $3,716.00 $3,716.00 <br />5 Options Analysis <br />5.1 Options Analysis for Solution Element 2 Outfall 66 $12,128.00 $12,128.00 <br />5.2 Options Analysis for Water Quality Treatment 98 $18,596.00 $18,596.00 <br />6 Utility Coordination <br />6.1 Franchise Utility Coordination 140 $21,544.00 $21,544.00 <br />6.2 Utility Potholing Coordination 52 $8,752.00 $8,752.00 <br />6.3 Utility Potholing by Vendor <br />7 Preliminary Design (19 sheets) <br />7.1 30% Stormwater Conveyance (15 sheets) 332 $49,292.00 $49,292.00 <br />7.2 30% Water Quality Treatment (4 sheets) 140 $22,260.00 $22,260.00 <br />8 Final Design (48 sheets) <br />8.1 60% Design 400 $59,940.00 $59,940.00 <br />8.2 90% Design 340 $51,220.00 $51,220.00 <br />8.3 100% Design 256 $37,212.00 $37,212.00 <br />8.4 Project Specifications 144 $22,436.00 $22,436.00 <br />8.5 Engineer's Estimate (30, 60, 90, final) 122 $20,800.00 $20,800.00 <br />\\rednea01\OTAK\PROJECT\21000\21001B\09 Corporate\Contracts\Dorn Ave Drainage Improvement_LOE _8_27_24.xlsx <br />Page 1 of 2 <br />8/29/2024