Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 98 <br />falls on a Saturday, the preceding Friday shall be counted a nonworking day. The days <br />between December 25 and January 1 will be classified as nonworking days. <br />An unworkable day is defined as a half or whole day the Engineer declares to be <br />unworkable because of weather or conditions caused by the weather that prevents <br />satisfactory and timely performance of the Work shown on the critical path of the <br />Contractor’s approved progress schedule. Other conditions beyond the control of the <br />Contractor may qualify for an extension of time in accordance with Section 1-08.8. <br />Contract Time shall begin on the effective date of the Notice to Proceed. The Contract <br />Documents may specify another starting date for Contract Time, in which case, Contract <br />Time will begin on the starting date the Contract Documents specify. <br />Each working day shall be charged to the Contract as it occurs, beginning on the <br />effective date of the Notice to Proceed, unless otherwise provided in the Contract <br />Documents, until the Contract Work is physically complete. Each week the Engineer <br />will provide the Contractor a statement that shows the number of working days: (1) <br />charged to the Contract the week before; (2) specified for the physical completion of the <br />Contract; and (3) remaining for the physical completion of the Contract. The statement <br />will also show the nonworking days and partial or whole day the Engineer declares as <br />unworkable. Within 14 calendar days after the date of each statement, the Contractor <br />shall file a written protest of any alleged discrepancies in it. To be considered by the <br />Engineer, the protest shall be in sufficient detail to enable the Engineer to ascertain the <br />basis and amount of time disputed. By not filing such detailed protest in that period, the <br />Contractor shall be deemed as having accepted the statement as correct. If the <br />Contractor elects to work ten hours a day and four days a week (a 4-10 schedule) and <br />the fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as <br />a working day then the fifth day of that week will be charged as a working day whether <br />or not the Contractor works on that day. <br />The Engineer will give the Contractor written notice of the Physical Completion Date for <br />all Work the Contract requires. That date shall constitute the Physical Completion Date <br />of the Contract, but shall not imply the City’s acceptance of the Work or the Contract. <br />The Engineer will give the Contractor written notice of the Completion Date of the <br />Contract after all the Contractor’s obligations under the Contract have been performed <br />by the Contractor. The following events must occur before the Completion Date can be <br />established: <br />1. The physical Work on the project must be complete; and <br />2. The Contractor shall furnish all documentation required by the Contract <br />and required by law, to allow the City to process final acceptance of the <br />Contract. The following documents must be received by the Engineer <br />prior to establishing a Completion Date: <br />a. Certified payrolls. <br />b. Material Acceptance Certification Documents. <br />c. Annual Report of Amounts Paid as MBE/WBE Participants. <br />d. Final Contractor Voucher Certification. <br />e. Copies of the approved “Affidavit of Prevailing Wages Paid” for <br />the Contractor and all Subcontractors. <br />f. A copy of the Notice of Termination sent to the Washington State <br />Department of Ecology (Ecology); the elapse of 30 calendar days <br />from the date of receipt of the Notice of Termination by Ecology; <br />and no rejection of the Notice of Termination by Ecology. This <br />requirement will not apply if the Construction Stormwater General