Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 108 <br /> Gravity sewer and <br />drain lines <br />Coordinates, <br />stations, and <br />offsets 0.1 ft. <br />I.E. 0.01 ft. Recalculate actual slopes. <br />All inverts in manholes. <br />All angle changes. <br /> Forcemains, <br />watermains and <br />transmission lines <br />Coordinates <br />and stations 0.1 <br />ft. <br />I.E. 0.1 ft. Record all angle points and <br />finished ground elev. Above <br />the invert elev. <br /> All other items, incl. <br />Electrical and <br />Structural <br />0.1 ft. 0.1 ft. Show dimensions on record <br />drawings. <br />Use red pen or pencil to make changes on the record drawings. Notations are to be <br />neat, legible, clear and concise. <br />Record information concurrently with the progress of construction. Conceal no work <br />until the required information is verified and recorded. <br />1-09 MEASUREMENT AND PAYMENT <br />1-09.1 Measurement of Quantities <br />Supplement 1-09.1 by adding the following: <br />Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br />the Contractor's responsibility to see that a certified weight ticket is given to the City’s <br />Inspector on the Project at the time of delivery of materials for each truckload delivered. <br />Pay quantities will be prepared on the basis of certified weight tickets delivered to the <br />City’s Inspector at time of delivery of materials. Tickets not received by the City’s <br />Inspector on day of delivery will not be honored for payment. <br />1-09.3 Scope of Payment <br />Supplement 1-09.3 by adding the following: <br />1-09.3(1) Schedule of Values <br />(******) <br />The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br />CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br />in part, then the Schedule of Values for that portion of the Work shall also be based on <br />unit prices. If the Proposal Form calls for a lump sum price, in whole or in part, then the <br />Schedule of Values shall: reasonably allocate the Contract Sum among the various <br />portions of the Work; be complete; be organized to include detailed breakdown of each <br />major unit of the Work; be organized to correspond to Contractor’s schedule; break down <br />the Contract Sum showing the value assigned to each part of the Work; include an <br />allowance for profit and Overhead; include Unit Price Work, if and to the extent indicated <br />on the Proposal Form; be so organized as to facilitate assessment of Work and payment <br />of Subcontractors; and be balanced. To the greatest extent possible, the breakdown <br />shall use the same tasks or units as the Contractor’s schedule. Contractor shall provide <br />documentation substantiating the cost allocation if asked by the City’s Representative. <br />Upon acceptance of the Schedule of Values by the City’s Representative, it shall be used <br />as a basis for all requests for payment. <br />1-09.4 Equitable Adjustment <br />Supplement 1-09.4 by adding the following: <br />Other means to establish the reasonable cost of the Work not defined by unit prices <br />include, and is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br />estimating manuals.