Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 111 <br />If Contractor disagrees with the adjustment of Contract Sum determined by the City’s <br />Representative, Contractor may submit a Contract Claim for the difference between the <br />amount determined by the City’s Representative and the amount sought by the <br />Contractor. <br />Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br />uncompleted Work. <br />1-09.6 Force Account <br />Supplement 1-09.6 by adding the following: <br />The City has estimated and included in the Proposal dollar amounts for all items to be <br />paid per Force Account. This is done only to provide a common Bid for Bidders. All <br />such dollar amounts are to become a part of Contractor's total bid. However, the City <br />does not warrant expressly or by implication that the actual amount of Work will <br />correspond with those estimates. Payment will be made on the basis of the amount of <br />Work actually authorized by Engineer. <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />1. Construction Identification Signs: Upon commencement of Work, the Contractor <br />shall furnish and erect two Project/Construction Identification Signs in accordance <br />with COE Standard Drawing No. 714, one at each end of each work area at <br />Engineer approved locations. <br />a. Contractor shall provide sign painting, lettering and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to <br />the surface of the sign face in accordance with COE Standard Plan No. 714. <br />The Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide: <br /> PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. The Project Information Sign shall display Ecology’s logo with reference that <br />the project received financial assistance from the Washington State <br />Stormwater Grant Program. <br />d. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City <br />use. <br />e. No separate payment for Project/Construction Identification Signs will be <br />made. All costs associated with this item shall be merged with the unit <br />contract price for "Mobilization." <br />1-09.9 Payments <br />Delete 1-09.9 and substitute the following: <br />1-09.9 Payments to Contractors <br />(******) <br />1-09.9(1) Progress Payments <br />Contractor shall submit progress payment estimate for completed Work and material on <br />hand based upon acceptable Work performed during the previous month, or since the