My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 112 <br />last partial payment estimate was submitted. Submit progress payment estimate to <br />City’s Representative by the tenth day of each month, or by schedule mutually agreed <br />upon in writing by the Contractor and City’s Representative at the Pre-Construction <br />Conference. Contractor shall make initial progress estimate not later than 30 days after <br />the Work begins. Make successive progress estimates every month thereafter until the <br />Completion Date. <br />Progress estimates made during progress of the Work are tentative, and made only for <br />the purpose of determining progress payment. The progress estimates are subject to <br />change at any time prior to the calculation of the Final Payment. <br />The value of the progress estimate will be the sum of the following: <br />1. Unit Price Items in the Proposal Form — the approximate quantity of <br />acceptable units of work completed multiplied by the unit price. <br />2. Lump Sum Items in the Proposal Form — the estimated percentage complete <br />multiplied by the Proposal Forms amount for each Lump Sum Item, or per the <br />schedule of values for that item. <br />3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job <br />site or other storage area approved by the Engineer. <br />4. Change Orders — entitlement for approved extra cost or completed extra <br />work as determined by the Engineer. <br />Progress payments will be made in accordance with the progress estimate less: <br />1. Retainage in accordance with 1-09.9(6) RETAINAGE, <br />2. The amount of Progress Payments previously made, and <br />3. Funds withheld by the City for disbursement in accordance with the Contract <br />Documents. <br />Progress payments for Work performed shall not be evidence of acceptable <br />performance or an admission by the City that any Work has been satisfactorily <br />completed. <br />Payments will be made by warrants, issued by the City’s fiscal officer, against the <br />appropriate fund source for the Project. Payments received on account of Work <br />performed by a Subcontractor are subject to the provisions of RCW 39.04.250. <br />Contractor’s submission of a progress pay estimate constitutes the Contractor’s material <br />representation that Contractor performed all of the Work described in the progress pay <br />estimate during the relevant time period in a conformance with these Plans and <br />Specifications and that the materials or Equipment for which payment is requested <br />reasonably conform to the Specifications and are either on the job site or have been <br />installed. If requested by the City’s Representative, provide additional data as may be <br />reasonably required to support the payment estimate. Additional data may include, but <br />not be limited to, satisfactory evidence of payment for Equipment, materials and labor, <br />including payments to Subcontractors and suppliers. Certified invoices by the suppliers <br />shall accompany a request for payment for delivered Equipment and material. Such <br />Equipment and material shall be suitably and safely stored at the site of the Work. <br />Payment requests shall summarize accepted operating and maintenance material with <br />request for Equipment payment. <br />A progress payment is preliminary only. By making a progress payment, the City does <br />not waive or release its right, nor is it estopped from asserting, that previous progress <br />payments were not earned or were in error, whether in whole or in part.
The URL can be used to link to this page
Your browser does not support the video tag.