My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 118 <br />the Contract Documents and the formal Contract Claim document has been <br />submitted <br />Full compliance by the Contractor with the provisions of this section is a contractual <br />condition precedent to the Contractor’s right to sue or seek any recovery against <br />the City in any legal proceeding. <br />1-09.11(2)B Contents <br />All Contract Claims filed by the Contractor shall be in writing, verified under penalty <br />of perjury by an officer or principal of the Contractor, and in sufficient detail to enable <br />the City’s Representative to ascertain the basis and amount of the Contract Claim. <br />All Contract Claims shall be submitted to the City's Representative. At a minimum, <br />each Contract Claim shall include: <br />1. A detailed factual statement of the Contract Claim for an adjustment to <br />the Contract Sum or Contract Time, if any, providing all necessary dates, <br />locations, and items of Work affected by the Contract Claim. <br />2. The dates of all facts related to the Contract Claim. <br />3. The name of each City’s individual, official, or employee involved in or <br />knowledgeable about the Contract Claim. <br />4. The specific provisions of the Contract that support the Contract Claim <br />and a statement of the reasons why such provisions support the Contract <br />Claim. <br />5. If the Contract Claim relates to a decision of the City’s Representative <br />that the Contract leaves to the City’s Representative’s discretion or as to <br />which the Contract provides that the City Representative’s decision is <br />final, the Contractor shall set out in detail all facts supporting its position <br />relating to the decision of the City’s Representative. <br />6. Identification of any documents and the substance of any oral <br />communications that support the Contract Claim. <br />7. Copies of any identified documents that support the Contract Claim, <br />other than City documents and documents previously furnished to the <br />City by the Contractor. Standard industry manuals may be incorporated <br />by reference. <br />8. If Contractor seeks an extension of Contract Time: <br />a. The specific amount of time, including days and dates, sought. <br />b. The specific reasons the Contractor believes an extension of <br />Contract Time should be granted, including, but not limited to, <br />compliance with the requirements of 1-08.3 PROGRESS <br />SCHEDULE and 1-08.8 EXTENSIONS OF TIME; and <br />c. The specific provisions of the Contract Documents under which <br />it is sought. <br />9. If Contractor seeks an increase in the Contract Sum, the exact amount <br />sought and a breakdown of that amount into the following categories: <br />a. Labor <br />b. Materials <br />c. Direct Equipment. The actual cost for each piece of equipment <br />for which a Contract Claim is made or in the absence of actual <br />cost, the rates established by the AGC/WSDOT Equipment <br />Rental Agreement that was in effect when the Work was <br />performed. In no case shall the amounts sought or paid for
The URL can be used to link to this page
Your browser does not support the video tag.