My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 2 – EARTHWORK September 20, 2024 <br />WO No. – UP 3775 SP – 137 <br />If there is no pay item for existing valve abandonment, then it shall be included with the <br />construction of other items of Work with no direct compensation made. <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT <br />2-03.1 Description <br />Supplement 2-03.1 by adding the following: <br />This Work applies to street pavement patching and street reconstruction after <br />completion of utility work. Grading for street reconstruction shall conform to COE <br />Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br />pavement patching shall conform to COE Standard Drawing No. 326, unless otherwise <br />noted on the Plans. <br />2-03.2 Vacant <br />Revise 2-03.2 as follows: <br />2.03.2 Materials <br />Materials shall meet the requirements of the following: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />2-03.3 Construction Requirements <br />Supplement 2-03.3 by adding the following: <br />Blasting is not allowed within the City limits of Everett. <br />Use suitable excavated material for roadway embankments. Dispose of surplus <br />excavated material or unsuitable material in accordance with 2-03.3(7). <br />Engineer will not approve payment for unauthorized excavation or embankment, or <br />both, beyond the limits indicated on the Plans. Return areas of unauthorized <br />excavation or embankment, or both, to their original conditions or better at the <br />Contractor’s expense. <br />Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br />Final grading shall produce a uniform surface within established tolerances and without <br />abrupt changes in grade. <br />Construction requirements for pavement patching authorized by Engineer outside of <br />Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br />No. 326 for existing asphalt concrete over prepared grade. <br />Provide temporary drainage to keep the subgrade free from standing water. <br />Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br />than 2-1/2 inches in greatest dimension. <br />Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br />elevations shown. Take care not to excavate below the specified grades. Maintain all <br />excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br />trash, and other debris. <br />2-03.3(2) Rock Cuts <br />Delete entire section. <br />2-03.3(3) Excavation Below Subgrade <br />Supplement 2-03.3(3) by adding the following: <br />Proof Rolling: Proof roll subgrade under the roadway with a fully loaded tandem <br />truck following trench backfilling and grading to subgrade to identify soft or loose <br />areas in the subgrade. In areas where the subgrade does not stand up to the
The URL can be used to link to this page
Your browser does not support the video tag.