My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 2 – EARTHWORK September 20, 2024 <br />WO No. – UP 3775 SP – 138 <br />proof roll, over excavate the subgrade and replace with imported Foundation <br />Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br />the subgrade up to the proper compaction and grade. Compact backfill material in <br />accordance with 2-03.3(3). <br />2-03.3(7) Disposal of Surplus Material <br />2-03.3(7)C Contractor-Provided Disposal Site <br />Delete the first paragraph of 2-03.3(7)C and substitute the following: <br />Make arrangements for disposal of surplus and other materials. All costs for <br />disposal of surplus and other materials shall be included with the respective <br />Bid items of the Contract with no direct compensation being made. <br />Dispose of Asbestos-cement pipe in accordance with the requirements of the <br />State of Washington Department of Ecology and the Snohomish County Solid <br />Waste Division. <br />2-03.4 Measurement <br />Delete all paragraphs under 2-03.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B - Bid Items Descriptions and provided in Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-03.5 Payment <br />Delete all paragraphs under 2-03.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />There will be no direct compensation made for haul on material moved within or from <br />the Project site and the Contractor shall include the cost of hauling in his various unit <br />contract prices. <br />There will be no direct compensation made for “Proof Rolling” as required in this <br />section for excavated portions of the roadway and the Contractor shall include costs in <br />his various unit Contract prices. <br />Payment for over excavation below subgrade and disposal of over excavated materials <br />as required in this section shall be included in the Bid item for Foundation Material. <br />Imported material required in this section shall be paid for by the unit Bid price for that <br />material. Payment for placement and compaction of import material shall be included <br />in the unit price per ton of import material. <br />2-04 HAUL <br />2-04.1 Description <br />Delete the first paragraph of 2-04.1 and substitute the following: <br />This Work shall consist of transporting excavated material from its original site to its final place <br />on the Project or to a Contractor arranged waste site. <br />2-04.3 Vacant <br />Revise 2-04.3 to read as follows: <br />2-04.3 Construction Requirements <br />Off-highway earth-moving equipment shall not haul on or across streets, roadways, driveways, <br />trails, sidewalks or parking lots not being improved in the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.