My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 5 – SURFACE TREATMENTS September 12, 2024 <br />AND PAVEMENTS <br />WO No. – UP 3775 SP - 148 <br />5-04.2(1)A Vacant <br />5-04.2(2) Mix Design – Obtaining Project Approval <br />Do NOT begin paving prior to the approval of the mix design by the Engineer. <br />Nonstatistical evaluation will be used for all HMA not designated as Commercial <br />HMA in the Contract Documents. <br />Commercial evaluation will be used for Commercial HMA and for other classes of <br />HMA in the following applications: sidewalks, road approaches, paths, trails, and <br />pavement repair. Obtain approval from Project Engineer for other nonstructural <br />applications of HMA accepted by commercial evaluation. Sampling and testing of <br />HMA accepted by commercial evaluation will be at the option of the Project <br />Engineer. The Proposal quantity of HMA that is accepted by commercial <br />evaluation will be excluded from the quantities used in the determination of <br />nonstatistical evaluation. <br />Nonstatistical Mix Design. Provide fifteen days prior to the first day of paving <br />one of the following mix design verification certifications for City review; <br />a. The WSDOT Mix Design Evaluation Report from the current WSDOT <br />QPL, or one of the mix design verification certifications listed below. <br />b. The proposed HMA mix design on WSDOT Form 350-042 with the seal <br />and certification (stamp & signature) of a valid licensed Washington State <br />Professional Engineer. <br />c. The Mix Design Report for the proposed HMA mix design developed by a <br />qualified City or County laboratory that is within one year of the approval <br />date.** <br />**The mix design shall be performed by a lab accredited by a national <br />authority such as Laboratory Accreditation Bureau, L-A-B for Construction <br />Materials Testing, The Construction Materials Engineering Council (CMEC’s) <br />ISO 17025 or AASHTO Accreditation Program (AAP) and shall supply <br />evidence of participation in the AASHTO: resource proficiency sample <br />program. <br />Mix designs for HMA accepted by Nonstatistical evaluation shall; <br />a. Have the aggregate structure and asphalt binder content determined in <br />accordance with WSDOT Standard Operating Procedure 732 and meet <br />the requirements of Sections 9-03.8(2), except that Hamburg testing for <br />ruts and stripping are at the discretion of the Engineer, and 9-03.8(6). <br />b. Have anti-strip requirements, if any, for the proposed mix design <br />determined in accordance with AASHTO T 283 or T 324, or based on <br />historic anti-strip and aggregate source compatibility from previous <br />WSDOT lab testing. <br />At the discretion of the Engineer, City may accept verified mix designs older than <br />12 months from the original verification date with a certification from the <br />Contractor that the materials and sources are the same as those shown on the <br />original mix design. <br />Commercial Evaluation: Approval of a mix design for “Commercial Evaluation” will <br />be based on a review of the Contractor’s submittal of WSDOT Form 350-042 (For <br />commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design <br />from the current WSDOT QPL or from one of the processes allowed by this <br />section. Testing of the HMA by the City for mix design approval is not required.
The URL can be used to link to this page
Your browser does not support the video tag.