My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 5 – SURFACE TREATMENTS September 12, 2024 <br />AND PAVEMENTS <br />WO No. – UP 3775 SP - 149 <br />For the Bid Item Commercial HMA, select a class of HMA and design level of <br />Equivalent Single Axle Loads (ESAL’s) appropriate for the required use. <br />5-04.2(2)B Using Warm Mix Asphalt Process <br />The Contractor may elect to use additives that reduce the optimum mixing <br />temperature or serve as a compaction aid for producing HMA. Additives include <br />organic additives, chemical additives and foaming processes. The use of <br />Additives is subject to the following: <br />a. Do not use additives that reduce the mixing temperature more than <br />allowed in Section 5-04.3(6) in the production of mixtures. <br />b. Before using additives, obtain the Engineer’s approval using WSDOT <br />Form 350-076 to describe the proposed additive and process. <br />5-04.3 Construction Requirements <br />5-04.3(1) Weather Limitations <br />Do not place HMA for wearing course on any Traveled Way beginning October 1st <br />through March 31st of the following year without written concurrence from the <br />Engineer. <br />Do not place HMA on any wet surface, or when the average surface temperatures are <br />less than those specified in Table 1, or when weather conditions otherwise prevent the <br />proper handling or finishing of the HMA. <br /> <br />Table 1 - Minimum Surface Temperature for Paving <br />Compacted Thickness <br />(Feet) Wearing Course Other Courses <br />Less than 0.10 55◦F 45◦F <br />0.10 to .20 45◦F 35◦F <br />More than 0.20 35◦F 35◦F <br />5-04.3(2) Paving Under Traffic <br />Apply the requirements of this Section when the Roadway being paved is open to <br />traffic. <br />Keep intersections open to traffic at all times, except; when paving the intersection or <br />paving across the intersection. During such time, and provided that there has been an <br />advance warning to the public, the intersection may be closed for the minimum time <br />required to place and compact the mixture. In hot weather, the Engineer may require <br />the application of water to the pavement to accelerate the finish rolling of the pavement <br />and to shorten the time required before reopening to traffic. <br />Before closing an intersection, place advance warning signs and signs marking the <br />detour or alternate route. <br />During paving operations, maintain temporary pavement markings throughout the <br />project. Install temporary pavement markings on the Roadway prior to opening to <br />traffic. Provide temporary pavement markings in accordance with Section 8-23. <br />Include all costs in connection with performing the Work in accordance with these <br />requirements, except the cost of temporary pavement markings, in the unit Contract <br />prices for the various Bid items involved in the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.