CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 5 – SURFACE TREATMENTS September 12, 2024 <br />AND PAVEMENTS <br />WO No. – UP 3775 SP - 167 <br />operation as it relates to the submitted planing plan and paving plan, <br />approved traffic control plan, and public convenience and safety. <br />Such discussion includes, but is not limited to: <br />1. General for both Paving Plan and for Planing Plan: <br />a. The actual times of starting and ending daily operations. <br />b. In intersections, how to break up the intersection, and <br />address traffic control and signalization for that <br />operation, including use of peace officers. <br />c. The sequencing and scheduling of paving operations <br />and of planing operations, as applicable, as it relates to <br />traffic control, to public convenience and safety, and to <br />other con-tractors who may operate in the Project Site. <br />d. Notifications required of Contractor activities, and <br />coordinating with other entities and the public as <br />necessary. <br />e. Description of the sequencing of installation and types of <br />temporary pavement markings as it relates to planning <br />and to paving. <br />f. Description of the sequencing of installation of, and the <br />removal of, temporary pavement patch material around <br />exposed castings and as may be needed <br />g. Description of procedures and equipment to identify <br />hidden metal in the pavement, such as survey <br />monumentation, monitoring wells, street car rail, and <br />castings, before planning, refer to Section 5-04.3(14)B2. <br />h. Description of how flaggers will be coordinated with the <br />planing, paving, and related operations. <br />i. Description of sequencing of traffic controls for the <br />process of rigid pavement base repairs. <br />j. Other items the Engineer deems necessary to address. <br />5. Paving – additional topics: <br />a. When to start applying tack and coordinating with <br />paving. <br />b. Types of equipment and numbers of each type <br />equipment to be used. If more pieces of equipment than <br />personnel are proposed, describe the sequencing of the <br />personnel operating the types of equipment. Discuss <br />the continuance of operator personnel for each type <br />equipment as it relates to meeting Specification <br />requirements. <br />c. Number of JMFs to be placed, and if more than one JMF <br />how the Contractor will ensure different JMFs are <br />distinguished, how pavers and MTVs are distinguished if <br />more than one JMF is being placed at the time, and how <br />pavers and MTVs are cleaned so that one JMF does not <br />adversely influence the other JMF. <br />d. Description of contingency plans for that day’s <br />operations such as equipment breakdown, rain out, and <br />Supplier shutdown of operations. <br />e. Number of sublots to be placed, sequencing of density <br />testing, and other sampling and testing.