My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 176 <br /> <br />7-05.4 Measurement <br />Delete all paragraphs of 7-05.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-05.5 Payment <br />Delete all paragraphs of 7-05.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-06 VACANT <br />Delete Section 7-06 and substitute the following: <br />7-06 WATER QUALITY TREATMENT STRUCTURES <br />(******) <br />7-06.1 Description <br />This work consists of furnishing and installing a Pretreatment Unit, Water Quality Treatment <br />Facility, and Roof Drain Connection(s). The Pretreatment Unit and Water Quality Treatment <br />Facility shall be of the same size and model specified and in accordance with the <br />configuration and location shown on the Plans and these Special Provisions. <br /> <br />Water Quality Treatment Facility shall include internal components, including items listed as <br />provided by manufacture, as indicated in the Plans, or an approved equivalent. The gravity <br />block wall surrounding the facility is measured and paid separately in accordance with <br />Division B – Bid Item Descriptions, Section 1-09 MEASUREMENT AND PAYMENT, and <br />Section 8-24. <br /> <br /> <br />7-06.2 Materials <br /> <br />Concrete 6-02 <br />Plant Materials 9-14.7 <br />Construction Geotextile 9-33 <br />Dissipation Rocks shall be 4” Streambed Cobbles per 9-03.11(2). <br />Perforated Polyvinyl Chloride (PVC) Underdrain Pipe, <br />8-inch diameter maximum 9-05.2(6) <br /> <br />Underdrain stone shall be Gravel Backfill for Drains, 9-03.12(4), or approved equal. <br /> <br />Diablo Ninebark, Physocarpus opulifolius, 5 gallon, 2-ft minimum planting height. <br /> <br />All materials sections under 7-04.2 and 7-05.2 shall apply. <br /> <br />Underdrain, distribution pipe, riser pipes and fittings shall be SDR 35 PVC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.