My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division B – BID DESCRIPTIONS September 20, 2024 <br />WO No. – UP 3775 SP - 16 <br /> <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(a) When 5% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for mobilization, or 5% of the total original contract <br />amount, whichever is the least, will be paid. <br />(b) When 10% of the total original contract amount is earned from other bid items. <br />100% of the amount bid for mobilization, or 10% of the total contract amount, <br />whichever is the least, will be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% <br />of the total original contract amount will be paid. <br /> Force Account/ Unexpected Conditions <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except as modified as below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid items is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer, <br />except work described in item (a) below, which may be initiated by the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(a) Control Density Fill backfill, where directed by the Engineer, to fill trenches and <br />excavations where conventional backfill cannot be adequately compacted. <br />(b) Adjust or replace water or sanitary sewer services to resolve conflict with new <br />stormwater systems. <br /> Other Traffic Control Labor <br />Measurement and Payment: Unit Price per Hour (HR) <br />This unit price bid item includes all costs associated with traffic control labor for flagging and <br />spotting as identified in 1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL <br />DIVICES of these <br />Special Provisions. <br />Furnish all personnel for flagging to control traffic, including pedestrians, during construction <br />operations in accordance with Section 1-10 of the Standard Specifications (as amended by <br />the Special Provisions), the Plans, approved traffic control plans, these Special Provisions <br />and as directed by the City. <br /> Maintenance and Protection of Traffic Control <br />Measurement and Payment: Lump Sum (LS)
The URL can be used to link to this page
Your browser does not support the video tag.