My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3rd Ave Water Quality Project Division C - CONTRACT September 20, 2024 <br />Work Order # UP3775 SP – 25 <br /> CITY OF EVERETT, WASHINGTON CONTRACT <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a municipal <br />corporation existing under the laws of the State of Washington (the “City”) and <br />_______________________________________________________ ( “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to furnish <br />all labor, tools, materials, equipment, and supplies required to complete in a workmanlike manner the <br />work, improvements, and appurtenances in accordance with the Specifications and Plans and all other <br />Contract Documents entitled: “3RD AVE WATER QUALITY FACILITY” (the “Project”). <br />1. Contract Documents. This Contract is the written agreement signed between the City and Contractor <br />and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID ITEM <br />DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications, Standard Plans in effect <br />as of the date Bids are opened, Addenda, supplemental agreements, change orders, certifications and <br />affidavits required by this Contract and by law, and Federal requirements that apply to this Contract and <br />Project, all of which are referred to as the “Contract Documents” and all of which are hereby incorporated <br />by reference. A copy of the Contract Documents that were posted for the Project on Builder’s Exchange <br />of Washington (www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a <br />single pdf and is available as follows: <br />Link to PDF <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing this <br />Contract. City and Contractor agree that this pdf contains all posted Contract Documents as of the Bid <br />Opening Date. City and Contractor further agree that this pdf may contain some other documents (such <br />as Reference Information) that are not Contract Documents. <br />2. Contract Time. Substantial completion shall be achieved within sixty ( 60 ) working days after <br />the effective date of the Notice to Proceed. Physical completion shall be within twenty ( 20 ) <br />working days after the actual date of issuance of substantial completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br />in the event that the Contractor does not complete the work in all respects and have it ready for use by the <br />substantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br />and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br />computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special Provisions, <br />for each and every working day required to accomplish substantial completion of the work in excess of <br />the period established above for substantial completion. For overruns in contract time occurring after the <br />physical completion date, liquidated damages shall be assessed at the rate computed in Section 1-08.9 of <br />the Standard Specifications, as may be amended by the Special Provisions, until the work is physically <br />complete. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.