My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 39 <br />b. Have a Washington Employment Security Department number, as required in <br />Title 50 RCW; and <br />c. Have a Washington Department of Revenue state excise tax registration <br />number, as required in Title 82 RCW. <br />4. Disqualification. Not be disqualified from bidding on any public works contract <br />under RCW 39.06.010 or 39.12.065(3). <br />5. Prevailing Wage Training. Unless Bidder has completed three or more public works <br />projects and had a valid business license for three or more years, Bidder must have <br />received Department of Labor and Industries training on the requirements related to <br />public works and prevailing wage under RCW 39.12 and RCW 39.04. <br />5. Certification of Wage Compliance. Within the three-year period immediately <br />preceding the date of the bid solicitation, not have been determined by a final and <br />binding citation and notice of assessment issued by the department of labor and <br />industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br />chapter 49.46, 49.48, or 49.52 RCW. <br />6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in <br />their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation. <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />(******) <br />This Project will not be subject to supplemental bidder responsibility criteria. <br />1-02.2 Plans and Specifications <br />Delete all paragraphs in 1-02.2 and substitute the following: <br />Information as to where Bid Documents can be obtained or reviewed will be found in the <br />Call for Bids (Advertisement for Bids) for the Work. <br />After Award of the Contract, the Contractor will receive up to six sets of the reduced <br />Plans (11" x 17") and accompanying Special Provisions. In addition, the City will supply <br />up to three sets of full size plans (22" x 34"). All Plans and Special Provisions will be <br />conformed with addenda unless Contractor requests otherwise. <br />Additional Plans and Special Provisions may be purchased by payment of the current <br />printing costs. <br />1-02.4 Examination of Plans, Specifications, and Site of Work <br />1-02.4(1) General <br />Delete the fifth paragraph of 1-02.4(1), beginning with “Bid prices shall reflect”, and <br />substitute the following: <br />Bid prices shall include everything necessary for the completion of the Work <br />including, but not limited to, providing the materials, equipment, tools, plant and <br />other facilities, and the management, superintendence, labor, and all necessary <br />testing services. <br />Revise the first sentence in the paragraph that begins with “Any prospective Bidder <br />desiring an explanation” to read as follows: <br />Any prospective Bidder desiring an explanation or interpretation of the Bid <br />Documents, shall request the explanation or interpretation in writing by close of
The URL can be used to link to this page
Your browser does not support the video tag.