My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 56 <br />authority to reject defective material and suspend Work that is being done improperly, subject <br />to the final decisions of the City’s Representative or, when appropriate, the City. <br />Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br />instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br />that does not meet the Contract requirements shall be at the Contractor’s risk and shall not <br />be a basis for a Contract Claim even if the inspectors or assistants purport to change the <br />Contract. <br />Assistants and inspectors may advise the Contractor of any faulty work or materials or <br />infringements of the terms of the Contract; however, failure of the City’s Representative or <br />the assistants or inspectors to advise the Contractor does not constitute acceptance or <br />approval. <br />1-05.3 Working Drawings <br />Revise the second paragraph to read as follows: <br />1. Type 1 – Submitted for City information. Submittal must be received by the City a <br />minimum of 7 working days before Work represented by the submittal begins. <br />2. Type 2 – Submitted for City review and comment. Unless otherwise stated in the <br />Contract, the Engineer will require up to 15 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall not proceed <br />with the Work represented by the Working Drawing until comments from the Engineer <br />have been addressed. <br />3. Type 2E – Same as a Type 2 Working Drawing with Engineering as described below. <br />4. Type 3 – Submitted for City review and approval. Unless otherwise stated in the <br />Contract, the Engineer will require up to 20 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall obtain the <br />Engineer’s written approval before proceeding with the Work represented by the <br />Working Drawing. <br />5. Type 3E – Same as a Type 3 Working Drawing with Engineering as described below. <br />Supplement 1-05.3 as follows: <br />The Contract Documents include Plans that show such details as are reasonably <br />necessary to give a comprehensive understanding of the Work. The Contractor shall <br />submit alterations affecting the requirements and information in the Plans in writing to <br />the Engineer for approval prior to performing such Work. <br />The Engineer may supplement the Plans with additional drawings and explanations, <br />consistent with the purpose and intent of the original Plans, to detail and illustrate the <br />Work. The Contractor shall perform the Work according to these supplemental drawings <br />and explanations. <br />In addition to supplemental drawings furnished by the Engineer, the Contract Documents <br />may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br />prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br />required by the Contract Documents to detail and illustrate portions of the Work. All <br />types of Working Drawings shall be reviewed by the Engineer before work pursuant to <br />those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br />and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br />steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br />falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br />may include, and not be limited to, Catalog cuts or standard plans for commonly used <br />manufactured items.