Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 57 <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and the <br />Engineer agree on dimensions and details. The City does not accept Working Drawings <br />as accurate or adequate, and does not take responsibility for, or warrant that Working <br />Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has in <br />writing called the Engineer's attention to each such variation at the time of submission, <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 5 SURFACE TREATMENT AND PAVEMENTS <br />5-04.2(2) Mix Design <br />5-04.3(14) Planing Plan and HMA Paving Plan <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br />7-05.3 Existing Manhole verification <br />7-06 Water Quality Treatment Structures <br />7-06.2 Materials-Catalog Cuts or Standard Plans <br />7-06.3(6) Submittals <br />7-08 General Pipe Installation Requirements <br />7-08.1 Submittals – Materials and Dewatering Plans <br />7-08.2 Materials-Catalog Cuts or Standard Plans <br />7-09 Water Mains <br />7-09.2 Materials-Catalog Cuts or Standard Plans <br />7-09.3(24) Flushing and disinfection procedures <br />7-12 Valves For Water Mains <br />7-12.2 Materials-Catalog Cuts or Standard Plans <br />7-14 Hydrants <br />7-14.2 Materials-Catalog Cuts or Standard Plans <br />8-01 Miscellaneous Construction <br />8-01.1 Submittals – TESC Plan and SWPPP <br />8-01.3(1)C Industrial Discharge Approval Request Form