CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 58 <br />8-02 Miscellaneous Construction <br />8-01.1 Materials-Catalog Cuts or Standard Plans <br />8-02.3 Roadside Work Plan <br />8-24 Gravity Block Wall <br />8-24.2 Materials-Catalog Cuts or Standard Plans <br />8-24.3 Gravity Block Wall Construction Drawings <br /> <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br />Contractor and approved by the Engineer. Where a Working Drawing is required by the <br />Specifications, related Work performed prior to completion of the Engineer's review of <br />the pertinent submission will be the sole expense and responsibility of the Contractor. <br />Supplement 1-05.3 by adding the following: <br />1-05.3(1) Submittals <br />(******) <br />Where required by the Contract Documents, the Contractor shall submit information, <br />such as Working Drawings that will enable the City’s Representative to advise the City <br />whether the Contractor's proposed materials, Equipment or methods of work are in <br />general conformance to the design concept and in compliance with the Plans and <br />Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br />complying with Contract requirements. The City’s approval of a Submittal does not <br />constitute a waiver of the Contract requirements. The City will not be obligated to accept <br />or pay for Work performed by the Contractor that may be affected by materials, <br />Equipment, or methods of work not submitted in a timely manner so that final review can <br />be accomplished before the affected Work is complete. The City shall not be responsible <br />for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br />by Contractor’s failure to submit required information in sufficient time for review, <br />comment, and correction. Contractor’s failure to submit required information in sufficient <br />time for review, comment and correction shall be deemed a waiver of any and all <br />Contract Claims for adjustment of Contract Sum or Contract Time arising out of, or <br />related to, such a Submittal. Contractor acknowledges and agrees that it may not rely <br />upon receiving the City’s response to a Submittal in less than 14 calendar days, unless <br />the City explicitly changes this section by a signed Change Order. <br />1-05.3(2) Requests for Information <br />(******) <br />Requests for information or clarification from the Contractor to the City shall be treated <br />as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br />1-05.4 Conformity With and Deviations From Plans and Stakes <br />Delete all of 1-05.4 and substitute the following: <br />The Contractor shall be responsible for setting and maintaining all alignment stakes, <br />slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br />paving, channelization, illumination, signing, bridges, and retaining walls, if such <br />construction is included in this Project. Except for the survey control data to be furnished <br />by the City, calculations, surveying, and measuring required for setting and maintaining <br />the necessary lines and grades shall be the Contractor's responsibility. The Contractor <br />shall provide the City with copies of such calculations and staking data when requested <br />by the Engineer. Copies of the City provided survey control data are available for the <br />Bidder's inspection at the office of the Project Engineer.