My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 63 <br />Upon receipt of written notice concurring in or denying substantial completion, whichever <br />is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br />interruption, the Work necessary to reach Substantial and Physical Completion. The <br />Contractor shall provide the Engineer with a revised schedule indicating when the <br />Contractor expects to reach substantial and physical completion of the Work. <br />The above process shall be repeated until the Engineer establishes the Substantial <br />Completion Date and the Contractor considers the Work physically complete and ready <br />for final inspection. <br />1-05.11(2) Final Inspection and Physical Completion Date <br />When the Contractor considers the Work physically complete and ready for final <br />inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br />final inspection. The Engineer will set a date for final inspection. The Engineer and the <br />Contractor will then make a final inspection and the Engineer will notify the Contractor <br />in writing of all particulars in which the final inspection reveals the Work incomplete or <br />unacceptable. The Contractor shall immediately take such corrective measures as are <br />necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br />diligently, and without interruption until physical completion of the listed deficiencies. This <br />process will continue until the Engineer is satisfied the listed deficiencies have been <br />corrected. <br />If action to correct the listed deficiencies is not initiated within seven days after receipt <br />of the written notice listing the deficiencies, the Engineer may, upon written notice to the <br />Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br />1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. <br />The Contractor will not be allowed an extension of Contract Time because of a Delay in <br />the performance of the Work attributable to the exercise of the Engineer’s right under <br />the authority of the Contract. <br />Upon correction of all deficiencies, the Engineer will notify the Contractor and the City, <br />in writing, of the date upon which the Work was considered physically complete. That <br />date shall constitute the Physical Completion Date of the Contract, but shall not imply <br />acceptance of the Work or that all the obligations of the Contractor under the Contract <br />have been fulfilled. <br />1-05.11(3) Operational Testing <br />It is the intent of the City to have at the Physical Completion Date a complete and <br />operable system. Therefore when the Work involves the installation of machinery or <br />other mechanical equipment; street lighting, electrical distribution or signal systems; <br />irrigation systems; buildings; or other similar work it may be desirable for the Engineer <br />to have the Contractor operate and test the Work for a period of time after final inspection <br />but prior to the Physical Completion Date. Whenever items of Work are listed in the <br />Contract Documents for operational testing they shall be fully tested under operating <br />conditions for the time period specified to ensure their acceptability prior to the Physical <br />Completion Date. During and following the test period, the Contractor shall correct any <br />items of workmanship, materials, or Equipment that prove faulty, or that are not in first <br />class operating condition. Equipment, electrical controls, meters, or other devices and <br />Equipment to be tested during this period shall be tested under the observation of the <br />Engineer, so that the Engineer may determine their suitability for the purpose for which <br />they were installed. The Physical Completion Date cannot be established until testing <br />and corrections have been completed to the satisfaction of the Engineer. <br />The costs for power, gas, labor, material, supplies, and everything else needed to <br />successfully complete operational testing, shall be included in the unit contract prices <br />related to the system being tested, unless specifically set forth otherwise in the Proposal.
The URL can be used to link to this page
Your browser does not support the video tag.