My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 64 <br />Operational and test periods, when required by the Engineer, shall not affect a <br />manufacturer’s guaranties or warranties furnished under the terms of the Contract. <br />1-05.12 Final Acceptance <br />Delete all of 1-05.12 and substitute the following: <br />The Contractor shall perform all the obligations under the Contract before the completion <br />date can be established. A certificate of completion of the Work issued by the City will <br />establish the completion date and certify the Work as complete. The following shall <br />occur before the completion date can be established: <br />The Final Contract Voucher Certification shall be signed by the Contractor verifying <br />agreement to the final contract price. <br />The physical work on the Project shall be complete. <br />The Contractor shall furnish all documentation required by the Contract and <br />required by law, necessary to allow the City to certify the Contract as complete. <br />A certificate of completion for the Work, signed by the City, will constitute acceptance of <br />the Work. The issuance of this certificate of completion will not constitute acceptance of <br />unauthorized or defective Work, Equipment, or materials. <br />The Contractor agrees that neither completion nor final acceptance shall relieve the <br />Contractor of the responsibility to indemnify, defend, and protect the City against any <br />claim or loss resulting from the failure of the Contractor, or the Subcontractors or lower <br />tier subcontractors, to pay all laborers, mechanics, Subcontractors, material persons, or <br />any other person who provides labor, supplies, or provisions for carrying out the Work <br />or for any payments required for unemployment compensation under Title 50 RCW or <br />for industrial insurance and medical aid required under Title 51 RCW. <br />Failure of the Contractor to perform all of the Contractor's obligations under the Contract <br />shall not bar the City from unilaterally certifying the Contract complete so the Engineer <br />may calculate a final contract price as provided in 1-09.9 PAYMENTS . <br />1-05.13 Superintendents, Labor and Equipment of Contractor <br />Delete 1-05.13. <br />1-05.14 Cooperation With Other Contractors <br />Delete all of 1-05.14 and substitute the following: <br />Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br />occupancy of the Project area. The Contractor shall ascertain to its own satisfaction the <br />scope of the Project and the nature of any other contracts that have been or may be <br />awarded by the City in the construction of the Project, or to the end that the Contractor <br />may perform this Contract in the light of such other contracts, if any. <br />The Contractor shall not cause unnecessary hindrance or Delay to others working on <br />this or other projects. If the performance of a contract for the Project is likely to be <br />interfered with by the simultaneous performance of some other contract or contracts, the <br />Engineer will decide which Contractor shall cease Work temporarily and which <br />Contractor shall continue, or whether the Work under the contracts can be coordinated <br />so that the contractors may proceed simultaneously. On all questions concerning <br />conflicting interest of contractors performing related Work, the decision of the Engineer <br />shall be binding upon all contractors concerned and the City, the Engineer, the City's <br />Representative, and their consultants shall not be responsible for any damages suffered <br />or extra costs incurred by the Contractor resulting directly or indirectly from the Award or <br />performance or attempted performance of any other contract or contracts on the Project <br />or caused by a decision or omission of the Engineer respecting the order of precedence <br />in the performance of the contracts.
The URL can be used to link to this page
Your browser does not support the video tag.