My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 66 <br /> <br />Supplement Section 1-05 by adding the following new subsections: <br />1-05.16 Water and Power <br />(******) <br />The Contractor shall make necessary arrangements, and shall bear the costs for power and <br />water necessary for the performance of the Work, unless the Contract includes power and <br />water as a pay item. <br />Contractor shall pay all power and water costs until Substantial Completion, whether such <br />power or water is provided by temporary or permanent facilities. City shall not be liable for <br />any costs or Delays arising out of or caused by the availability or lack of availability of <br />permanent power or utilities. <br />1-05.17 Oral Agreements <br />(******) <br />No oral agreement, representation or conversation with or by any officer, agent, or employee <br />of the City, either before or after execution of the Contract, shall affect or modify any of the <br />terms or obligations contained in any of the documents comprising the Contract. Such oral <br />agreement, representation or conversation shall be considered as unofficial information and <br />in no way binding upon the City, unless subsequently put in writing and signed by the City. <br />1-05.18 Contractor <br />(******) <br />1-05.18(1) Contractor's Representative <br />The Contractor shall notify the City in writing of the name of the person who will act as <br />the Contractor's representative, will have the authority to act in matter relating to this <br />Contract, and will be delegated with authority to act as the Contractor’s emergency <br />contact. This person shall have authority to carry out the provisions of the Contract and <br />to supply materials, Equipment, tools and labor without delay for the performance of the <br />Work. <br />Contractor shall employ and keep on site on a full time basis personnel experienced in <br />the management of construction of projects of this size and type. These shall include, <br />but not be limited to, a project manager and superintendent. Unless the City agrees <br />otherwise in writing, neither the Contractor’s project manager nor the superintendent <br />shall have supervisory responsibility for other projects for the Contractor while assigned <br />to this Project. Contractor shall employ and assign such additional, full time office, <br />support and engineering personnel to support the project manager and superintendent <br />and allow timely completion of the Project. The project manager and superintendent <br />shall be approved by the City, and such approval shall not be unreasonably withheld. <br />Contractor shall submit personnel qualifications within seven (7) days of Contractor’s <br />execution of the Contract. Basis for disapproval include, but are not limited to, lack of <br />sufficient experience managing the construction of similar type or size projects or <br />relationships on other projects unsatisfactory to the City or, if the Project is subject to <br />supplemental bidder responsibility criteria and such criteria contain personnel <br />qualifications, the personnel differ from those named by Bidder in its pre-Award <br />supplemental bidder responsibility criteria submittals. City may require removal and <br />replacement of Contractor’s supervisory staff who are disruptive or who appear to lack <br />sufficient competence to complete the Project successfully. <br />1-05.18(2) Construction Procedures <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where
The URL can be used to link to this page
Your browser does not support the video tag.