My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 65 <br />If, through acts of neglect on the part of the Contractor, any others suffer loss or damage <br />on the Work, the Contractor agrees to resolve such loss or damage fairly and <br />expeditiously. If such other shall assert any claim against the City, the Engineer, the <br />City's Representative, or their consultants on account of any damage alleged to have <br />been so sustained, the City shall notify the Contractor, who shall hold harmless, <br />indemnify, and defend the City, Engineer, the City's Representative, and their <br />consultants, and each of their directors, officers, employees, and agents against any <br />such claim, including all attorney's fees and any other costs incurred by the indemnified <br />parties relative to any such claim. <br />The Contractor shall coordinate its work with other contractors and utility companies that <br />may have facilities in the Project area and cooperate with them. The Contractor shall <br />also coordinate its activities with the City; and no water mains, individual water services, <br />street, or private driveways may be closed off without a minimum of five working days <br />notice to the City and the private property owner. Should the property owner or the City <br />have adequate reason, as determined by the Engineer, to avoid access or water service <br />shutoff at the scheduled time, the Contractor shall reschedule its work to meet the new <br />condition. <br />Final grading to subgrade and subgrade preparation in those areas disturbed by the <br />utilities companies shall be the responsibility of the Contractor and included in the street <br />construction and no additional compensation will be paid. <br />The Contractor shall cooperate with the utility companies and their subcontractors and <br />so conduct its operations that the necessary construction of their facilities can be <br />accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.