My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 72 <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br />1-07.1 Laws to be Observed <br /> 1-07.1(1) General <br /> Revise 1-07.1(1) by replacing the second sentence of the first paragraph with the <br />following: <br />The Contractor shall indemnify, defend, and save harmless the City (including its agents, <br />officers, and employees) against any claims that may arise because the Contractor (or <br />any employee of the Contractor or Subcontractor or material person) violated a legal <br />requirement. <br /> 1-07.1(2) Health and Safety <br />Supplement 1-07.1(2) by adding the following: <br />The Contractor shall be in compliance at all times with all COVID-19 Requirements <br />applicable to the Work.Contractor’s Bid includes all costs necessary for the duration of the <br />Work for compliance with Baseline COVID-19 Requirements.. <br />Supplement 1-07.1by adding the following: <br />1-07.1(6) Additional Requirements <br />The Contractor shall be in compliance with all applicable standards, orders, or <br />requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], Section <br />508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental <br />Protection Agency Regulations (40 CFR Part 15). (Contracts, subcontracts, and <br />subgrants of amounts in excess of $100,000). <br />The Contractor shall comply with mandatory standards and policies relating to energy <br />efficiency that are contained in the state energy conservation plan issued in compliance <br />with the Energy Policy and Conservation Act (Pub. L. 94-163). <br />The City advises all general contractors and subcontractors that numerous Federal, <br />State, and Local regulations exist that could affect the procedures used in the completion <br />of this project. The City advises each prospective Contractor that they are responsible <br />to be aware of and comply with all applicable statutes and regulations. It is <br />recommended that each Contractor contact the local office of the following agencies for <br />a list of applicable regulations and requirements that might affect the implementation of <br />this project: <br />• Federal Environmental Protection Agency <br />• Washington Department of Health <br />• Washington Department of Ecology <br />• Washington Department of Fisheries <br />• Washington Department of Wildlife <br />• Washington Department of Labor & Industries <br />• Puget Sound Air Pollution Control Agency <br />• Municipal Building Department <br />• Municipal Planning Department <br />• Municipal Public Works Department <br />If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br />Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br />requirements of the Washington Department of Labor & Industries for such work <br />including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br />complying with these regulations or any other regulations listed above are included in <br />the Contractor’s Proposal.
The URL can be used to link to this page
Your browser does not support the video tag.