My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 73 <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall <br />apply continuously, and not be limited to normal working hours. The required or implied <br />duty of the Engineer to conduct construction review of the Contractor’s performance <br />does not, and shall not, be intended to include review and adequacy of the Contractor’s <br />safety measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels <br />of greater than 55 db(A). Contractor may apply for a Noise Variance a minimum of 30 <br />days prior to performing work and pay $100.00 application fee, using the following link <br />to obtain the latest information on noise variance requirements: <br />https://www.everettwa.gov/formcenter/human-resources-16/request-for-temporary- <br />construction-noise-167. The Contractor must not assume that a Noise Variance will be <br />granted. In no event will the Contractor be entitled to any adjustment of the Contract <br />Sum or Contract Time if a Noise Variance is denied. <br />Typical requirements include, and not limited to, broadband backup alarms on all <br />equipment requiring a backup alarm, anti-tail gate slamming devices, dump truck bed <br />liners, and sawcutting, vacuum excavation, pavement breaking and loading export haul <br />noise must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays <br />and between 8:00 a.m. and 6:00 p.m. on weekends. <br />Appendix E contains the City of Everett’s Noise Ordinance for Bidder’s reference. <br />Approval to continue Work during these hours may be revoked at any time the Contractor <br />exceeds the City’s noise control regulations or complaints are received from the public <br />or adjoining property owners regarding the noise from the Contractor’s operation. The <br />Contractor shall have no claim for damages or delays should such permission be <br />revoked for these reasons. <br />1-07.2 State Taxes <br />Delete 1-07.2 and substitute the following: <br />1-07.2 State Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State <br />sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br />Contractor should contact the Washington State Department of Revenue for answers to
The URL can be used to link to this page
Your browser does not support the video tag.