My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 75 <br />1-07.5 Environmental Regulations <br /> <br />1-07.5(1) General <br />Supplement 1-07.5(1) by adding the following: <br /> <br />Protection of the Environment: No construction related activity shall contribute to <br />the degradation of the environment, allow material to enter surface or ground <br />waters, or allow particulate emissions to the atmosphere, which exceed state or <br />federal standards. Any actions that potentially allow a discharge to state waters <br />must have prior approval of the Washington State Department of Ecology. <br /> <br />1-07.5(4) Air Quality <br />Delete all of 1-07.5(4) and substitute the following: <br />The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br />(PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br />Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br />Contractor shall submit a dust control plan including dust control measures for its <br />activities related to this Contract that may cause dust. This plan shall be submitted <br />to the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the Contractor’s <br />Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of Everett. <br />All general building, electrical, plumbing permits will be issued at no cost to the <br />Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br />disposal sites shall be in the United States, unless otherwise expressly stated in the <br />Contract Documents or the City gives prior written approval. <br />This Project contains less than one acre of total disturbed area within the project <br />limits and does not require Contractor to apply for Ecology’s Construction <br />Stormwater General Permit. <br />1-07.9 Wages <br />1-07.9(1) General <br />Delete the first paragraph of 1-07.9(1) and substitute the following: <br />This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br />RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br />prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br />Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br />responsible to use the schedule in effect at the Bid Opening Date, determine the <br />appropriate labor classification(s), and use the appropriate and correct prevailing <br />wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br />can be obtained at the following URL: <br />https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing- <br />wage-rates <br />Printed copies of the current prevailing wage rates are available for viewing at City <br />of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard
The URL can be used to link to this page
Your browser does not support the video tag.