My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 79 <br />the preceding paragraphs of this Section shall be valid and enforceable only to the extent <br />of the Contractor’s negligence or the negligence of its agents and employees. <br />The Contractor shall bear sole responsibility for damage to completed portions of the <br />project and to property located off the project caused by erosion, siltation, runoff, or <br />other related items during the construction of the project. The Contractor shall also <br />bear sole responsibility for any pollution of rivers, streams, ground water, or other <br />waters that may occur as a result of construction operations. <br />The Contractor shall exercise all necessary precautions throughout the life of the Project <br />to prevent pollution, erosion, siltation, and damage to property. <br />The City will forward to the Contractor all claims filed against the City that are deemed <br />to have arisen in relation to the Contractor’s Work or activities under this Contract, and, <br />in the opinion of the City, are subject to the defense, indemnity, and insurance provisions <br />of the Contract Documents. Claims will be deemed tendered to the Contractor and <br />insurer, who has named the City as a named insured or an additional insured under the <br />Contract’s insurance provisions, once the claim has been forwarded via certified mail to <br />the Contractor. The Contractor shall be responsible to provide a copy of the claim to the <br />Contractor’s designated insurance agent who has obtained/met the Contract’s insurance <br />provision requirements. <br />Within 60 calendar days following the date a claim is sent by the City to the Contractor, <br />the Contractor shall notify the City Attorney’s Office of the following: <br />a. Whether the claim is allowed or is denied in whole or in part, and, if so, the <br />specific reasons for the denial of the individual claim, and if not denied in full, <br />when payment has been or will be made to the claimant(s) for the portion of <br />the claim that is allowed, or <br />b. If resolution negotiations are continuing. In this event, status updates will be <br />reported no longer than every 60 calendar days until the claim is resolved or <br />a lawsuit is filed. <br />If the Contractor fails to provide the above notification within 60 calendar days, then the <br />Contractor shall yield to the City sole and exclusive discretion to allow all or part of the <br />claim on behalf of the Contractor, and the Contractor shall be deemed to have <br />WAIVED any and all defenses, objections, or other avoidances to the City’s <br />allowance of the claim, or the amount allowed by the City, under common law, <br />constitution, statute, or the Contract and these Standard Specifications. If all or <br />part of a claim is allowed, the City will notify the Contractor via certified mail that it has <br />allowed all or part of the claim and make appropriate payments to the claimant(s) with <br />City funds. <br />Payments of funds by the City to claimant(s) under this Section will be made on behalf <br />of the Contractor and at the expense of the Contractor, and the Contractor shall be <br />unconditionally obligated to reimburse the City for the “total reimbursement amount”, <br />which is the sum of the amount paid to the claimant(s), plus all costs incurred by the <br />City in evaluating the circumstances surrounding the claim, the allowance of the claim, <br />the amount due to the claimant, and all other direct costs for the City’s administration <br />and payment of the claim on the Contractor’s behalf. The City will be authorized to <br />withhold the total reimbursement amount from amounts due the Contractor, or, if no <br />further payments are to be made to the Contractor under the Contract, the Contractor <br />shall directly reimburse the City for the amounts paid within 30 days of the date notice <br />that the claim was allowed was sent to the Contractor. In the event reimbursement <br />from the Contractor is not received by the City within 30 days, interest shall accrue on <br />the total reimbursement amount owing at the rate of 12 percent per annum calculated <br />at a daily rate from the date the Contractor was notified that the claim was allowed.
The URL can be used to link to this page
Your browser does not support the video tag.