My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 80 <br />The City’s costs to enforce recovery of these amounts are additive to the amounts <br />owing. <br />The Contractor specifically assumes all potential liability for actions brought by <br />employees of the Contractor and, solely for the purpose of enforcing the defense and <br />indemnification obligations set forth in 1-07.14, the Contractor specifically waives any <br />immunity granted under the State industrial insurance law, Title 51 RCW. This waiver <br />has been mutually negotiated by the parties. The Contractor shall similarly require that <br />each Subcontractor it retains in connection with the project comply with the terms of this <br />paragraph, waive any immunity granted under Title 51 RCW, and assume all liability for <br />actions brought by employees of the Subcontractor. <br />The indemnity, defense and other obligations in this 1-07.14 are in addition to any <br />indemnity, defense or other obligation that may be contained elsewhere in the Contract <br />Documents. <br />1-07.17 Utilities and Similar Facilities <br />Supplement 1-07.17 by adding the following: <br />The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law <br />relating to underground utilities. Cost to the Contractor incurred as a result of complying <br />with this law shall be at the Contractor's expense. In accordance with RCW 19.122, the <br />Contractor shall call the Utility Coordinating Council One Call Center, 1-800-424- <br />5555, for field location, not less than 2 nor more than 10 business days before the <br />scheduled date for commencement of excavation that may affect underground utility <br />facilities, unless otherwise agreed upon by the parties involved. A business day is <br />defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br />holiday. <br />The Contractor shall be responsible for determining the exact location, including service <br />connections, of all public and private underground utilities marked at the site of the Work. <br />The Contractor shall perform field verification prior to beginning Work that could result <br />in damage to buried utilities, including but not limited to exploratory excavations, in <br />sufficient time so as not to impede the progress of the Work or fabrication of materials <br />to be incorporated into the Work. The Contractor shall immediately notify the City’s <br />Representative as to any utility discovered by him in a different position than shown on <br />the Plans or that is not shown on the Plans. <br />No excavation shall begin until all known underground public and private utilities in the <br />vicinity of the excavation area have been located and marked. <br />Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of the <br />City to show the existence of subsurface objects or installation on the Plans shall not <br />relieve the Contractor from its responsibility to make an independent check on the <br />ground, nor relieve Contractor from all liability for damages resulting from its operations. <br />It shall be entirely the responsibility of the Contractor to give proper notification to the <br />agencies that have utilities in place and to coordinate with these agencies in the <br />protection and relocation of the various underground installations. These agencies will <br />give assistance in the location of the various utilities, but this shall not relieve the <br />Contractor from responsibility for any damage incurred. The City shall require a <br />notification of at least five working days. The Contractor shall hold the City harmless <br />against any claim of any nature resulting from Delays in attending to same. <br />Following are addresses and telephone numbers of utilities in the Everett area for the <br />Contractor's convenience as of December 15, 2022: <br />
The URL can be used to link to this page
Your browser does not support the video tag.