My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />WORK ELEMENT 2 SURVEYING <br />This Work Element will be provided by Furtado & Associates (Furtado) to provide topographic <br />survey and engineering basemaps of the existing Merrill & Ring Bridge and its surroundings, <br />including survey of wetland flagging placed for Ordinary High-Water Mark (OHWM) of the Ck <br />and topo mapping of the ravine below it. Please see the Surveying Limits Exhibits, included <br />herein for a depiction of the limits. <br /> <br />The east-west project limits along W. Mukilteo Blvd. will begin 150’ southwesterly of the bridge <br />structure and continue 110’ beyond the northeasterly end of the bridge structure. The limits <br />include the intersections with Mukilteo Ln. and Shore Ave. <br /> <br />Above the ravine mapping will be to full Right-of-Way from Mukilteo Ln. to the top of the <br />ravine and from Shore Ave to the top of the ravine. The limits include the top of bridge from <br />barrier edge to barrier edge. <br /> <br />The survey team anticipates using a 3D terrestrial scanner for mapping the roadways and the <br />underside of the bridge structure. <br /> <br />2.1 Project Management/ QA/QC <br />This task includes the survey project management, administrative duties, and quality <br />control proper for a project of this kind, complexity and need of coordination. The <br />survey team will assign a Survey Project Manager and a Survey Quality Leader for this <br />project. The Survey Quality Leader will provide a QC or QA role to support the Survey <br />Project Manager for appropriate delivery packages. <br /> <br /> <br />2.2 Surveying <br />2.2.1 Survey Control <br />This task includes the establishment of survey control for the project, including the <br />recovery of relevant existing survey control, as required for the project. Typically, survey <br />control will be comprised of both found and set control marks including any available <br />local monuments in immediate proximity of the project limits. This survey control is <br />established to support the mapping and ROW calculation effort and future phases of the <br />project. <br />x The horizontal datum for this project will be NAD83/2011(Epoch2010.0), <br />Washington State Plane, North Zone, using the unit of USFT. <br />x The vertical datum for the survey work shall reference NAVD88, using the unit <br />of USFT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.