My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 27 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />WORK ELEMENT 6 UTILITY COORDINATION <br /> <br />Perteet will assist the City in managing the utility coordination process for the project, which will <br />include providing utility franchises (Snohomish County Public Utility District #1 [SnoPUD] <br />power, Puget Sound Energy [PSE] gas, Comcast, and Ziply) and City owned utilities (water and <br />sewer) with project information, copies of each PS&E submittal, and identification of potential <br />utility conflicts and relocations. Perteet will coordinate and manage the potholing efforts through <br />the design phase. Perteet will also prepare and maintain a utility coordination log, and conflicts <br />and resolution spreadsheet, both of which will be maintained and updated throughout the design <br />phase of the project. <br /> <br />Perteet will perform the utility impact assessment and coordinate on work elements as described <br />below: <br /> <br />6.1 Utility Coordination <br />Perteet will coordinate with the various public and private utilities along the corridor. <br />Coordination will include working with the identified utilities to allow for each to be included <br />under the City’s project permits and environmental documents. <br /> <br />Services provided by Perteet under this subtask will include: <br />x Preparing and maintaining a utility coordination contact log containing company <br />addresses, contact staff, e-mail addresses, and phone numbers. <br />x Acquiring and reviewing record drawings of existing utilities within the project limits. <br />Perteet will request the utilities review the existing basemapping for the project and <br />verify the locations and presence of the utilities. Discrepancies with the existing basemap <br />will be coordinated by Perteet with each utility and Furtado, and changes to the basemap <br />will be done by Furtado. <br />x Coordinating and attending up to three (3) virtual meetings with the group of the <br />franchise utilities (after 30%, 60%, and 90%) and up to three (3) separate virtual meetings <br />with specific utilities as needed (assume total of six [6] meetings). Perteet will prepare <br />meeting agendas and notes. <br />x Preparing a Utility Conflicts Spreadsheet. Track potential utility conflicts and resolution <br />of those conflicts throughout the project in the spreadsheet. This includes identification of <br />pothole needs. This includes documentation of which facilities will be relocated prior to, <br />or during, construction. <br />x Providing the utility owners with electronic (PDF) copies of the 30%, 60%, 90%, 100%, <br />and Ad-Ready plan sheets, as well as potential conflict locations. <br /> <br />It is assumed that the following utility franchises exist within the vicinity of the Merrill and Ring <br />Bridge Replacement. These include: <br />x Power (SnoPUD) <br />x Cable, Communications, and Fiber Optics (Comcast and Ziply) <br />x Gas Distribution (PSE) <br />x Water (City of Everett) <br />x Sanitary Sewer (City of Everett)
The URL can be used to link to this page
Your browser does not support the video tag.