My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 29 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />x Managing pothole program on behalf of franchise utilities and City. Perteet will identify <br />potholing needs, on the utility conflicts spreadsheet, and by preparing an exhibit of <br />potholing locations. Prepare and maintain the utility coordination log, utility conflict and <br />potholing plans, utility conflict and resolution matrix, and distribution of potholing <br />results to utilities. <br />x Utilizing a utility potholing service for those locations that will not be provided by a <br />franchise utility. This Scope of Services assumes up to 8 pothole locations. <br /> <br />Assumptions: <br />x Utility potholing will be provided by a utility locate service under this contract. <br />x The budget assigned for this work element will be limited to the amount designated for <br />this work element. <br /> <br />Deliverables: <br />x Utility information updated according to pothole results at the 60% and 90% design <br />phases <br />x Pothole location exhibits and results log <br /> <br />6.3 Relocation Coordination and Utility Space Plan <br /> <br />Perteet will coordinate with the franchise utilities regarding franchise utility design and proposed <br />utility locations, and provide the following services: <br />x Coordinating with the franchise utility owner to relocate facilities (facility relocates <br />provided by franchise utility owner), helping identify potential locations for franchise <br />utilities to relocate to. Perteet will review the franchise utilities design and plans in an <br />effort to confirm there will be no conflict with other facilities and the City’s proposed <br />project work. <br />x Prepare Utility Space Plans: Perteet will prepare utility space plans and typical sections <br />that will be the result of the coordination with the franchise utilities and City utilities and <br />will show proposed and existing utility locations. The purpose of these Plans will be to <br />provide potential locations for relocated utilities and to confirm with franchise utilities <br />acceptable locations for relocated facilities and to be used as a communication tool. <br />These will NOT be construction Plans for the City or the franchise utilities. Proposed <br />franchise utilities, as designed by the franchise utilities, will be shown by reference in the <br />PS&E documents described in other tasks. Relocation of the City’s water main, including <br />design and PS&E, will be completed as detailed under Task 11.3. <br /> <br />Assumptions: <br />x The redesign and/or relocation of franchise-owned utilities Plans for construction will not <br />be performed by Perteet, and relocation Plans prepared by the franchise utility will not be
The URL can be used to link to this page
Your browser does not support the video tag.