Laserfiche WebLink
Page 33 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />WORK ELEMENT 9 ILLUMINATION AND SIGNAGE <br /> <br />This work element is performed by David Evans and Associates, Inc., to provide illumination, <br />and permanent signage design services. <br /> <br />Based on the City’s selected alternative, David Evans and Associates, Inc. will provide design <br />services associated with illumination, and permanent signing design. The illumination design is <br />intended for the Bridge and its immediate approaches. <br /> <br />David Evans and Associates, Inc. team will prepare 30%, 60%, 90%, 100% and Ad-ready plans, <br />specifications, and engineering cost estimates. <br /> <br />This work element includes the following tasks: <br /> <br />9.1 Illumination <br />The design team will discuss guidelines and criteria with the City. The team will develop a <br />design basis report outlining the lighting design approach, design criteria, target luminance and <br />luminance levels, power densities, wiring schematics, sources (discuss with the PUD service <br />types and locations), color temperature and control intent. <br /> <br />Following the input from the City, the lighting engineer will develop illumination PS&E, <br />lighting schedules and provide required fixture catalog cuts. <br /> <br />9.2 Permanent Signing <br />The design team will prepare final permanent signing sheets to reflect the final signing conditions <br />when the project is completed. This effort will include an inventory of existing signs, upgrading <br />sign messages as necessary, preparation of signing plans, sign specification sheets, and sign details <br />for non-standard signs. The final signing plans will include signs for motorists, bicycles, and <br />pedestrians. <br />Assumptions: <br /> <br />Deliverables: <br />x Illumination PS&E at 30%, 60%, 90%, & 100% and Ad-ready design levels. <br />x Permanent Signing PS&E at 30%, 60%, 90%, 100% and Ad-ready design levels. <br />