My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 33 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />WORK ELEMENT 9 ILLUMINATION AND SIGNAGE <br /> <br />This work element is performed by David Evans and Associates, Inc., to provide illumination, <br />and permanent signage design services. <br /> <br />Based on the City’s selected alternative, David Evans and Associates, Inc. will provide design <br />services associated with illumination, and permanent signing design. The illumination design is <br />intended for the Bridge and its immediate approaches. <br /> <br />David Evans and Associates, Inc. team will prepare 30%, 60%, 90%, 100% and Ad-ready plans, <br />specifications, and engineering cost estimates. <br /> <br />This work element includes the following tasks: <br /> <br />9.1 Illumination <br />The design team will discuss guidelines and criteria with the City. The team will develop a <br />design basis report outlining the lighting design approach, design criteria, target luminance and <br />luminance levels, power densities, wiring schematics, sources (discuss with the PUD service <br />types and locations), color temperature and control intent. <br /> <br />Following the input from the City, the lighting engineer will develop illumination PS&E, <br />lighting schedules and provide required fixture catalog cuts. <br /> <br />9.2 Permanent Signing <br />The design team will prepare final permanent signing sheets to reflect the final signing conditions <br />when the project is completed. This effort will include an inventory of existing signs, upgrading <br />sign messages as necessary, preparation of signing plans, sign specification sheets, and sign details <br />for non-standard signs. The final signing plans will include signs for motorists, bicycles, and <br />pedestrians. <br />Assumptions: <br /> <br />Deliverables: <br />x Illumination PS&E at 30%, 60%, 90%, & 100% and Ad-ready design levels. <br />x Permanent Signing PS&E at 30%, 60%, 90%, 100% and Ad-ready design levels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.