My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 44 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />x Perteet will prepare preliminary calculations for flow control and water quality treatment <br />facilities. Budget will be for the design of one (1) flow control facility and one (1) water <br />quality facility. This information will be used during the preliminary bridge Type, Size <br />and Location analysis. Only one of the concepts developed by the bridge designer will be <br />studied from a drainage standpoint. This concept will be mutually agreed upon by the <br />bridge and stormwater designer. <br />x Once a concept has been selected for draft and final design the stormwater flow control <br />and water quality treatment calculations will be updated as necessary for inclusion in the <br />PS&E. <br /> <br />Deliverables: <br />x Preliminary flow control and water quality treatment calculations (to be used for showing <br />Type, Size and Location of the proposed flow control and water quality treatment <br />facilities in support of the preliminary bridge design alternatives analysis. <br />x Draft flow control and water quality treatment calculations (to be included in the Draft <br />Drainage Report) <br />x Final flow control and water quality treatment calculations (to be included in the Final <br />Drainage Report). <br /> <br />12.1.6 Pipe Conveyance Calculations <br />Perteet will prepare storm pipe conveyance capacity calculations for new pipe segments <br />associated with the project site: <br />x Design Development (60%): Prepare preliminary pipe sizing calculations, using full-flow <br />conditions with the Manning equation and the Rational Method. <br />x Final design: Finalize pipe sizing calculations <br />x Gutter flow and sag analysis: Prepare gutter flow and sag analysis (if low point is within <br />project limits) to make sure the flow spread is contained with the roadway shoulders. <br /> <br />Assumptions: <br />x No new outfalls will be needed. The new conveyance system will tie into existing storm <br />drain systems that already lead to existing outfalls. It is further assumed that these <br />existing outfall systems have the capacity to accommodate project flows. <br />x Low infiltration rates and steep slopes make infiltration infeasible and infiltration BMPs <br />will not need to be evaluated as part of the analysis. <br /> <br />Deliverables: <br />x Conveyance Calculations (to be included in the Drainage Report) <br />x Gutter flow analysis (to be included in the Drainage Report) <br /> <br />12.1.7 Drainage Report <br />Perteet will assemble a draft drainage report (60% design phase) and final drainage report (90% <br />design phase). The drainage report will include a written assessment and summary of the surface <br />water design features on the project, summary of tables, flow control and water quality treatment <br />calculations, pipe capacity calculations, drainage basin maps, backwater analysis (Hydraulic <br />Grade Line), and supporting exhibits.
The URL can be used to link to this page
Your browser does not support the video tag.