My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 45 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br /> <br />Deliverables: <br />x Draft Drainage Report at 60% PS&E phase (one [1] electronic PDF copy) <br />x Final Drainage Report at 90% PS&E phase (one [1] electronic PDF copy) <br /> <br />12. 2 TS&L and Alternative Design Study <br />Perteet will prepare horizontal and vertical alignment alternatives for the project to support the <br />analysis of up to three bridge alignment alternatives. The horizontal and vertical alignments for <br />the project will be evaluated as part of the civil alternatives analysis. <br />An opinion of cost will be prepared based on the alternatives. The opinion of cost will be <br />based on unit prices and incorporate about a 30% contingency to account for the level of <br />completeness of plan preparation, and to reflect experience on similar projects within the <br />region. <br />Perteet will prepare the Civil, Roadway, Water & Drainage Design section of the TS&L <br />Report and deliver to David Evans and Associates, Inc. to be compiled with the rest of the <br />TS&L Report. The Civil, Roadway, Water & Drainage Design section will include the <br />Roadway, Water, and Drainage Design criteria, design parameters, a proposed cross section <br />figure, and other key design elements necessary for determining the preferred alternative. The <br />Civil, Roadway, Water & Drainage Design section of the TS&L Report will include a <br />recommendation for the approximate horizontal and vertical alignments. The exact alignments <br />will be fixed during future design phases. <br />Selection of the preferred alternative will be made by the City stakeholders, and the preferred <br />alternative will be carried forward in the design. <br />Deliverables: <br />x Draft and Final versions for up to three (3) alternative roadway plans and profiles as roll <br />plots (PDF) <br />x Draft and Final versions of the Opinion of Cost for each alternative (Excel) <br />x Draft and Final versions of the Civil, Roadway, Water, & Drainage Design section of the <br />TS&L Report (Word) <br />x Written responses to City comments on the Draft deliverables <br /> <br />12.3 Plans, Specifications, and Estimate <br />Construction plans, specifications, and an opinion of cost will be prepared based on the <br />recommendations identified during the alternatives analysis and the stormwater design <br />documentation tasks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.