Laserfiche WebLink
Page 45 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br /> <br />Deliverables: <br />x Draft Drainage Report at 60% PS&E phase (one [1] electronic PDF copy) <br />x Final Drainage Report at 90% PS&E phase (one [1] electronic PDF copy) <br /> <br />12. 2 TS&L and Alternative Design Study <br />Perteet will prepare horizontal and vertical alignment alternatives for the project to support the <br />analysis of up to three bridge alignment alternatives. The horizontal and vertical alignments for <br />the project will be evaluated as part of the civil alternatives analysis. <br />An opinion of cost will be prepared based on the alternatives. The opinion of cost will be <br />based on unit prices and incorporate about a 30% contingency to account for the level of <br />completeness of plan preparation, and to reflect experience on similar projects within the <br />region. <br />Perteet will prepare the Civil, Roadway, Water & Drainage Design section of the TS&L <br />Report and deliver to David Evans and Associates, Inc. to be compiled with the rest of the <br />TS&L Report. The Civil, Roadway, Water & Drainage Design section will include the <br />Roadway, Water, and Drainage Design criteria, design parameters, a proposed cross section <br />figure, and other key design elements necessary for determining the preferred alternative. The <br />Civil, Roadway, Water & Drainage Design section of the TS&L Report will include a <br />recommendation for the approximate horizontal and vertical alignments. The exact alignments <br />will be fixed during future design phases. <br />Selection of the preferred alternative will be made by the City stakeholders, and the preferred <br />alternative will be carried forward in the design. <br />Deliverables: <br />x Draft and Final versions for up to three (3) alternative roadway plans and profiles as roll <br />plots (PDF) <br />x Draft and Final versions of the Opinion of Cost for each alternative (Excel) <br />x Draft and Final versions of the Civil, Roadway, Water, & Drainage Design section of the <br />TS&L Report (Word) <br />x Written responses to City comments on the Draft deliverables <br /> <br />12.3 Plans, Specifications, and Estimate <br />Construction plans, specifications, and an opinion of cost will be prepared based on the <br />recommendations identified during the alternatives analysis and the stormwater design <br />documentation tasks. <br />