My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 47 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />in a later design phase. A substantial change in the layout will constitute a change in <br />scope and will allow Perteet to negotiate additional compensation for the change. <br />x Proposed improvements will extend beyond the existing right-of-way. Right-of-way <br />plans will be developed by Perteet after comments are incorporated from the 30% review. <br />x All required walls will need to be structurally designed by David Evans and Associates, <br />Inc.. Perteet will provide preliminary wall alignments and profiles in AutoCAD format <br />for David Evans and Associates, Inc. to use in creating plan sheets. <br />x The bid schedule for the opinion of cost will include up to one (1) bid schedule. <br /> <br />Deliverables: <br />x 30% design-level plans (half-size [11”x17”], PDF) <br />x 30% design-level opinion of cost summary (Excel) <br />x Preliminary wall alignment and profiles to David Evans and Associates, Inc. (AutoCAD) <br /> <br />Task 12.3.2 - 60% Plans and Opinion of Cost <br />Perteet will prepare 60% civil, roadway, water, and drainage plans and opinion of costs for the <br />construction contract, and incorporate applicable comments received from the City based on the <br />30% submittal deliverables. The plans and opinion of cost will be submitted to David Evans and <br />Associates, Inc. to be incorporated into the 60% P&E set. <br /> <br />Response to 30% Comments <br />Perteet will attend one (1) comment review meeting with David Evans and Associates, Inc. and <br />the City staff and provide the City with written responses to the City’s comments. Responses will <br />be provided on the comment documents provided by the City. <br /> <br />60% Plans <br />It is anticipated that the 60% civil, roadway, water, and drainage plans will consist of the <br />following sheets (48 sheets): <br />x Survey Control and Construction Alignment Plan (1 sheet) <br />x Right-of-Way Plan (4 sheets) <br />x Total Parcel Plan (1 sheet) <br />x Site Preparation and Temporary Erosion and Sediment Control (TESC) Plan (4 sheets) <br />x Construction Access Plan (4 sheets) <br />x Typical Sections (2 sheets) <br />x Paving Plan and Profile (4 sheets) <br />x Drainage Plan and Profile (4 sheets) <br />x Drainage Details (4 sheets) <br />x Water Main Plan and Profile (4 sheets) <br />x Water Main Details (2 sheets) <br />x Miscellaneous Details (2 sheets) <br />x Driveway Profiles (2 sheets)
The URL can be used to link to this page
Your browser does not support the video tag.