Laserfiche WebLink
Page 48 of 59 <br />City of Everett Merrill & Ring Bridge Replacement <br />x Channelization and Signing Plan (2 sheets) <br />x Channelization and Signing Details (1 sheet) <br />x Site Grading Restoration Plan (2 sheets) <br />x Vegetation Restoration Plan (4 sheets) <br />x Vegetation Restoration Details (1 sheet) <br />60% Opinion of Cost <br />Perteet will calculate 60% level quantities and opinion of construction costs based upon the 60% <br />construction plans and current unit bid prices. Perteet will address applicable 30% review <br />comments and make revisions as necessary. <br />60% P&E QA/QC and Constructability Review of Deliverables <br />An internal Perteet quality assurance/quality control review of deliverables will be conducted, as <br />well as confirmation that comments received have been addressed. A record of comments <br />received will be maintained. Response to each comment received will be tracked to confirm that <br />they have been addressed. <br />Perteet will also perform a preliminary constructability review of the 60% Civil P&E under this <br />task. This will be done by a member of Perteet’s construction inspection team. <br />Assumptions: <br />x 30% plan review comments from City staff will be consolidated by the City and <br />conflicting comments will be resolved by City staff prior to transmitting to Perteet. <br />x Perteet’s responses will be provided on the original comment document the City provided <br />to Perteet. <br />x Perteet will attend one (1) comment review meeting held virtually. <br />x All required walls will need to be structurally designed by David Evans and Associates, <br />Inc.. Perteet will provide preliminary wall alignments and profiles in AutoCAD format <br />for David Evans and Associates, Inc. to use in creating plan sheets. <br />x Specifications will not be provided at the 60% design-level. <br />Deliverables: <br />x Written responses to 30% comments <br />x 60% design-level plans (half-size [11”x17”], PDF) <br />x 60% design-level opinion of cost summary (Excel) <br />x Wall alignment and profiles to David Evans and Associates, Inc. (AutoCAD) <br />Task 12.3.3 - 90% Plans, Specifications, and Opinion of Cost <br />Perteet will prepare 90% plans, specifications, and opinion of costs for the construction contract, <br />and incorporate applicable comments received from the City based on the 60% submittal