My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 48 of 59 <br />City of Everett Merrill & Ring Bridge Replacement <br />x Channelization and Signing Plan (2 sheets) <br />x Channelization and Signing Details (1 sheet) <br />x Site Grading Restoration Plan (2 sheets) <br />x Vegetation Restoration Plan (4 sheets) <br />x Vegetation Restoration Details (1 sheet) <br />60% Opinion of Cost <br />Perteet will calculate 60% level quantities and opinion of construction costs based upon the 60% <br />construction plans and current unit bid prices. Perteet will address applicable 30% review <br />comments and make revisions as necessary. <br />60% P&E QA/QC and Constructability Review of Deliverables <br />An internal Perteet quality assurance/quality control review of deliverables will be conducted, as <br />well as confirmation that comments received have been addressed. A record of comments <br />received will be maintained. Response to each comment received will be tracked to confirm that <br />they have been addressed. <br />Perteet will also perform a preliminary constructability review of the 60% Civil P&E under this <br />task. This will be done by a member of Perteet’s construction inspection team. <br />Assumptions: <br />x 30% plan review comments from City staff will be consolidated by the City and <br />conflicting comments will be resolved by City staff prior to transmitting to Perteet. <br />x Perteet’s responses will be provided on the original comment document the City provided <br />to Perteet. <br />x Perteet will attend one (1) comment review meeting held virtually. <br />x All required walls will need to be structurally designed by David Evans and Associates, <br />Inc.. Perteet will provide preliminary wall alignments and profiles in AutoCAD format <br />for David Evans and Associates, Inc. to use in creating plan sheets. <br />x Specifications will not be provided at the 60% design-level. <br />Deliverables: <br />x Written responses to 30% comments <br />x 60% design-level plans (half-size [11”x17”], PDF) <br />x 60% design-level opinion of cost summary (Excel) <br />x Wall alignment and profiles to David Evans and Associates, Inc. (AutoCAD) <br />Task 12.3.3 - 90% Plans, Specifications, and Opinion of Cost <br />Perteet will prepare 90% plans, specifications, and opinion of costs for the construction contract, <br />and incorporate applicable comments received from the City based on the 60% submittal
The URL can be used to link to this page
Your browser does not support the video tag.